Similar Projects
Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 CJ est. value
Kansas City, MO 64131

Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 CJ est. value
Kansas City, MO 64131

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

Indian Creek Trail Improvements
Infrastructure
Results
Kansas City, MO 64114

West 79th Street Sidewalks - Washington to Summit
Infrastructure
Results
MO 64114

AC Rialto Hotel
Renovation, Infrastructure - 169,000 SF
Construction
$65,700,000 CJ est. value
Kansas City, MO 64106

D/B-Design Build Services for a New Detention Center Facility
LEED Certification, New Construction, Infrastructure
Construction
$256,500,000 CJ est. value
Kansas City, MO 64133

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Longview Tract by The Bay Water Park - City of Kansas City
Infrastructure
Conception
$315,000 CJ est. value
Kansas City, MO 64134

Pacific + Troost Residential
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Kansas City, MO 64106

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Last Updated 06/01/2023 11:21 AM
Project Title

Wornall Reconstruction - 75th to 79th - City of Kansas City

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64114   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2020
Bids Due View project details and contacts
Estimated Value $4,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is scheduled to coordinate with the Waldo Federal Funded Project and will reconstruct the pavement, curb, gutter, and sidewalks on Wornall Road from 75th Street to 79th Street. This will include the addition of sidewalks in areas where they currently do not exist, the reconfiguration the parking lot at the northeast corner of 75th Street and Wornall Road, and will close Broadway Road. Sidewalk, transit stops, and pedestrian pads will be included, as well as a connection to the Trolley Track Trail. Recycled asphalt will be used for the pavement and additional trees will be planted. Project is Included City of Kansas City (KCMO) FY 2020-2024 CIP. As of May 1, 2020, information regarding a design team or a general contractor is not available. A firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents