Similar Projects
Construct New Addition to Transit Administrative Building - City of Battle Creek
Addition, Infrastructure
Conception
$16,400,000 CJ est. value
Battle Creek, MI 49014

Woodland Park & Nature Preserve - Planning/Improvement - City of Battle Creek
New Construction, Infrastructure, Term Contract
Conception
$1,980,000 CJ est. value
Battle Creek, MI 49017

Jackson Street Parking Lot Reconstruction - City of Battle Creek
Infrastructure
Design
$1,000,000 CJ est. value
Battle Creek, MI 49037

River Restoration/Pedestrian Bridge/Railroad Pedestrian Access
New Construction, Infrastructure
Bidding
$434,000 CJ est. value
Springfield, MI 49037

Hot Mix Asphalt Base Crush, Signing, Storm Sewer, Bridge Deck Repair and Pavement Markings on River Street/haven Road
Infrastructure
Bidding
$1,173,000 CJ est. value
Albion, MI 49224

Battle Creek Montessori - Flexible Plan Classroom
Renovation
Post-Bid
Springfield, MI 49037

High School and Elementary Improvements
Renovation
Post-Bid
Battle Creek, MI

Marshall Iron and Metal - In-Situ Remediation
Alteration
Results
Marshall, MI 49068

High School - Fire Alarm Replacement
Renovation
Results
Battle Creek, MI

RFP D/B - Hot Mix Asphalt Resurfacing and Reconstruction on I-94
Demolition, New Construction, Infrastructure
Construction
$159,129,390 CJ est. value
Marshall, MI 49068

Construction for Rehabilitate Taxiway A - City of Battle Creek
Infrastructure
Pending Verification
$4,654,016 CJ est. value
Battle Creek, MI 49015

Recreation Center - New Splash Pad Water Features - City of Battle Creek
Addition, Demolition, Renovation
Conception
$450,000 CJ est. value
Battle Creek, MI 49017

Flash Flood Water Park Pool Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
Battle Creek, MI 49017

2021 Series 1 Bond
Renovation
Post-Bid
Battle Creek, MI 49015

North Eaton Street Sidewalk Improvements
Infrastructure
Results
$177,000 CJ est. value
Albion, MI 49224

Last Updated 10/24/2022 10:47 AM
Project Title

Doris Klaussen Development Center Pool Infill

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49014   (Calhoun County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: This project entails the filling of the existing pool and replacing it with a smaller therapy pool. Also included is the build-out of several classrooms, bathrooms and workrooms in the space the original pool used to occupy. RFI questions cut off October 19, 2022, 3:00 PM BIDDERS REQUEST FOR INFORMATION: Submission cut-off date is October 19, 2022, 3:00 PM. A fillable RFI form is located on the CSM Group plan room. Typed RFIs are to be submitted to andrea.hempsted@csmgroup.com. TYPE OF CONTRACT: The base bid shall be a lump sum amount, for the work as set forth in the bid documents. CONTRACT SECURITY: Payment and Performance Bonds will be required for all awarded contracts in excess of $50,000 and the cost of these bonds is to be included in your base bid. All packages less than $50,000 must state, as an alternate, the cost of providing Payment and Performance Bonds. RIGHTS RESERVED: The Owner reserves the right to accept or reject any and all bids, alternates, or proposals, and to accept bids, alternates, or proposals that, in its sole judgment, serve its best interests. *Addendum 01 has been released. *Please see attached for RFI's 001-006 issued for the CISD Doris Klaussen Developmental Center Pool Infill project. Below is a recap of the current bid documents, for your convenience. A few things to note: All bidders must submit a bid for a Bid Package in its entirety. No partial Bid Packages will be accepted. All bids are to include a completed scope of work for the Bid Packages (no scope of work excluded). See Project Manual, Section G, Scopes of Work. A Bid Bond or Certified Check MUST be submitted with your bid. Regardless of bid amount. Please see the BID REQUIREMENTS section below. BID DATES October 25, 2022, 1:00 PM, Local Time PROPOSALS Sealed bids will be received, on behalf of Calhoun Intermediate School District, at CSM Group, 600 East Michigan Avenue, Suite A, Kalamazoo, MI 49007. No electronic bids will be accepted. Envelopes are to be clearly marked with Project name and number and Bid Package name and number. If contractors are bidding more than one bid package, the bids must be submitted in separate envelopes. Bids will be publicly opened and read aloud. Bids received after specified date and time will not be accepted and will be returned unopened. Bids will be accepted as single "Bid Packages", or "Combination Bid Packages" as determined to be in the Owner's best interest. Combination bids shall be submitted in separate envelopes. Fillable bid forms and other project forms can be found in the Project Forms folder in our online plan room. BID REQUIREMENTS (review all bid documents) Bid Bond or Certified Check - regardless of bid amount Familial Statement of Disclosure - signed and notarized Affidavit of Compliance - Iran Economic Sanctions Act - signed and notarized Bid Form - fully completed and signed (must use fillable form attached) Unit Pricing and Bid Breakdown BID OPENING Bids will be read aloud publicly, October 25, 2022, 1:00 PM. Bidders may attend the bid opening in person or virtually. Bidders are to contact tracy.harrison@csmgroup.com, if attending virtually, for a link to the meeting. Microsoft Teams Meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 224 565 049 826 Passcode: wUgJwG Download Teams | Join on the web Or call in (audio only) +1 586-250-2707,,874808348# United States, Warren Phone Conference ID: 874 808 348# Find a local number | Reset PIN BID DOCUMENTS PROJECT MANUAL - DKDC Pool Infill 10.07.2022 DRAWINGS - DKDC Pool Infill 09.13.2022 SPECIFICATIONS - DKDC Pool Infill 09.13.2022 ADDENDUMS ADDENDUM 01 - DKDC Pool Infill 10.14.2022 CLARIFICATIONS CLARIFICATION 01 - DKDC Pool Infill 10.18.2022 RFIs (RFI Submission Cutoff 10/27/22 by 3:00 PM) RFI 001 - Earthwork Scope RFI 002 - Silt Sock Request RFI 003 - Fire Alarm Details RFI 004 - Flooring and Wall Tile RFI 005 - Pool Discharge Materials to Sump Basin RFI 006 - Door Hardware Sets RFI 008 - Acoustical Ceilings RFIs (Yet to be issued) RFI 007 - Existing Wood Door Veneer *Please see attached for Clarification 01 and RFI 007 issued for the CISD Doris Klaussen Developmental Center Pool Infill project. Below is a recap of the current bid documents, for your convenience. A few things to note: All bidders must submit a bid for a Bid Package in its entirety. No partial Bid Packages will be accepted. All bids are to include a completed scope of work for the Bid Packages (no scope of work excluded). See Project Manual, Section G, Scopes of Work. A Bid Bond or Certified Check MUST be submitted with your bid. Regardless of bid amount. Please see the BID REQUIREMENTS section below. *Please see attached for RFIs 009, 010 and 011 issued for the CISD Doris Klaussen Developmental Center Pool Infill project. *Please see attached for RFI 12 issued for the CISD Doris Klaussen Developmental Center Pool Infill project.

Details

4,936 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents