Similar Projects
I-215; Various Locations Preservation - Roadway
Bidding
$500,000 to $1,500,000 est. value
UT

300 East (11400 South to 11800 South) Reconstruction Project
Bidding
Draper, UT 84020

500 South Main Street Development
Post-Bid
Salt Lake City, UT

Annual Contract for Sewer Clean-Out
Term Contract
Post-Bid
Salt Lake City, UT

DFCM Construction-Pre Qualification for General/Mechanical/Electrical/Roofing/Paving Contractors
Results
$3,500,000 est. value

8800 South Reconstruction Project - Phase 1
Results
Sandy, UT

McDonald`S #43-0069
Construction
Sandy, UT 84070

2020 High Density Mineral Bond
Bidding
South Jordan, UT 84095

Southern Utah Rotomill RFI
Post-Bid
Salt Lake City, UT 84104

4100 South Bangerter Highway to 5460 West
Results
$15,000,000 to $2,000,000 est. value
Salt Lake City, UT

2020 Shoulder Improvements
Bidding
Sandy, UT 84070

Concrete Pavement Cold Patch Repair
Term Contract
Post-Bid

9-Line Corridor Improvements
Results
$720,000 est. value
Salt Lake City, UT

Reconstruction for Foxbridge Streets
Post-Bid
Midvale, UT

DFCM Construction - DOC USCF Off-Site Infrastructure Improvements
Results
Less than $70,000,000 est. value
Salt Lake City, UT

Last Updated 03/08/2019 09:59 PM
Project Title

Rush Trail Extension Phase 2

Physical Address View project details and contacts
City, State (County) Draper, UT   (Salt Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation. Design and construction services for approximately 0.5 miles of the Rush Mountain Bike Trail Extension Phase 2.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents