Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Theatrical Lighting and Sound Equipment
Alteration
Bidding
Manchester, NH 03103

Kohler 24KW Generator with Pad
Alteration
Bidding
New Hampton, NH

Municipal Solar Project - Landfill Site
Post-Bid
Jaffrey, NH

Solar Photovoltaic Roof-Mounted System
Post-Bid
Wolfeboro, NH

J--Electrical Services BOA SB SA
Results
Manchester, NH 03104

Electrical Installation and Modification Services
Results
$2,500 to $490,927 est. value
Hanover, NH

Design/Build Services - High Voltage Transformers Replacements
Post-Bid
Concord, NH

Generator Rental Services
Results
Concord, NH 03301

Energy Performance Contracting Services
Post-Bid
Concord, NH 03301

Solar Design, Assembly and Installation
Results
Less than $68,000 est. value
Plaistow, NH

Energy Performance Contract
Post-Bid
Somersworth, NH

Photovoltaic Project at Haller and Boucher Apartments
Results
$80,000 to $100,000 est. value
Concord, Penacook, NH

Electrical Vehicle Charging Station
Post-Bid
Peterborough, NH

Last Updated 12/13/2021 09:59 AM
Project Title

Barnard Pool Three Phase Electrical Service

Physical Address View project details and contacts
City, State (County) Goffstown, NH 03045   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site/Demolition Work - Wood structure around existing electrical equipment will need to be redesigned to gain 3’ clearance per NEC code. Prep and install new wood panel for the new box. Installation Provide a new 200 amp 3 phase service to the pool house (replace what’s existing not for future expansion) Install a 200 amp 3 phase meter socket on the side of the building . Install 4” conduit up the pole including elbows (galvanized steel). Bond according to the NEC. Feed 200 amp panel board from new meter socket. Re-Feed the existing pool loads utilizing the existing equipment Excavation. Trenching 3’ deep, sand, buried electrical line marker tape backfill. Bollards. Install 2 bollards in front of the new meter to protect it from physical damage Exclusions. All finished landscaping will be done by the Parks and Recreation Department.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents