Similar Projects
District-Wide HVAC Improvements
Renovation
Design
$412,435 CJ est. value
Richmond, IL 60071

DNR Moraine Hills HVAC Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
McHenry, IL 60051

Weatherization (IHWAP) Program
Term Contract
Post-Bid

Air Filters
Term Contract
Post-Bid
IL

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

2022 HVAC Improvements - Mechanical Equipment BG 1 BP #1-4
Alteration
Results
Crystal Lake, IL 60014

HVAC Air Filters - District Wide
Alteration
Post-Bid
Algonquin, IL

McHenry East Community HS Secured Entrances
Alteration
Results
McHenry, IL 60050

Replacing Hvac, Driveway Repairs, and Furnace Replacement In A Group Home Facility
Term Contract
Post-Bid
McHenry, IL

HVAC Scheduled Inspections, Service, Maintenance and Authorized Repairs
Term Contract
Results
Arlington Heights, Bridgeview, Des Plaines, East Dundee, Elgin, Elk Grove Village, Evanston, Harvey, Hoffman Estates, Joliet, Markham, McHenry, Melrose Park, North Aurora, Plainfield, South Holland, Waukegan, IL 60050

Air Purification System
Alteration
Post-Bid
$200,000 est. value
McHenry, IL

2022 HVAC Improvements - Bid Group 2 Bid Packages 1-6
Renovation, Alteration
Results
Crystal Lake, IL 60014

Guaranteed Energy Savings Contract Project
Renovation
Post-Bid
$1,400,000 CJ est. value
Algonquin, IL 60102

2022 Washington School HVAC Improvements
Alteration
Results
Harvard, IL 60033

Algonquin Road School HVAC Improvements 2023
Renovation
Post-Bid
$310,000 CJ est. value
Fox River Grove, IL 60021

Last Updated 01/12/2023 02:06 PM
Project Title

2023 HVAC Improvements - Mechanical Equipment - Bid Group 1 Bid Packages #1 - #2

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60014   (McHenry County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Crystal Lake Elementary District 47 is accepting sealed bids for: 2023 HVAC Improvements - Mechanical Equipment. Such proposals as herein concerned shall be for the following as described: BID GROUP 1 BID PACKAGES #1 - #2 Bid Package #01 - Vertical Unit Ventilators Bid Package #02 - Chillers, RTUs, AHUs, Univents, Fan Coils, MAUs and VAVs Pre-qualification of all bidders in this bid phase is required prior to the bid due date. Submit one fully executed copy of AIA Document A305 "Contractor's Qualification Statement" prior to submitting this bid form via email to Zachary Kampen at zkampen@pepperconstruction.com. The competency and responsibility of the bidders will be considered in making awards. The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid. Bonds shall comply with all laws of the State of Illinois governing public contracts let by governmental units. Bid security in the form of a Bid Bond, certified check or cashier's check made payable to Crystal Lake Elementary District 47 in an amount equal to not less than ten percent (10%) of the Base Bid shall be submitted with the Bid. Bid security is required of all parties submitting a proposal. A fully executed and compliant Bid Security must be included with the Bid Form. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The Construction Manager for this project is Pepper Construction Company. All questions concerning this project or those concerning bidding requirements should be directed to: Zachary Kampen. Questions must be received via email to zkampen@pepperconstruction.com until 3:00 PM (CST) Tuesday, October 4th, 2022. The School District reserves the right to reject any or all bids, to negotiate contract terms with various Bidders, and to waive all formalities or irregularities to any bid when such is deemed by the Owner to be in the Owner's best interests. *The construction manager will only release information and documents to bidders

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents