Similar Projects
SR 429 Widening from Tilden Road to Florida's Turnpike
Infrastructure
Bidding
Winter Garden, FL 34787

SEC Stackout Pad and Warehouse Road Repair
Infrastructure
Bidding
Orlando, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

S.R. 538 Poinciana Parkway Widening from Ronald Reagan Parkway to Cypress Parkway
Results
Orlando, FL 32807

Design Build Push Button Contract No. 2 - Program Management
Results

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Resurfacing - SR 500
Infrastructure
Bidding
$2,117,781 est. value
FL

Cove Drive and Sol Avenue Roadway Improvements Project
Infrastructure
Post-Bid
$492,289 est. value
Belle Isle, FL 32812

Emergency Roadway Repair
Results
Less than $1,000,000 est. value

Intersection Improvement - SR 435
Infrastructure
Bidding
$1,022,481 est. value
FL

Cold In-Place Bituminous Base Recycling with Asphalt Resurfacing
Term Contract
Post-Bid
$13,057,755 est. value
Orlando, FL

Milling and Resurfacing
Results
Less than $8,563,692 est. value
FL

Asphalt Paving, Striping and Overlay
Infrastructure
Bidding
FL

Last Updated 01/12/2022 05:39 AM
Project Title

Utilities Operation Center East (UOC-East) and Eastern Water Reclamation Roadway Improvements

Physical Address View project details and contacts
City, State (County) Orlando, FL 32825   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $41,382,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Orange County Utilities Eastern Water Reclamation Facility Access roadway and intersection improvements at Curry Ford Road include the addition of a right-turn and left-turn deceleration lanes and a mast arm traffic signal. The road includes the following: pavement widening and reconstruction, earthwork, milling and resurfacing, curb and gutter, drainage pipes and structures, sodding, fencing, pavement markings, signs, mast arm traffic signal, gate, guardhouse, maintenance of traffic, utility construction, utility adjustments, and utility coordination including lighting. The road length is approximately 2,500 feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents