Similar Projects
Safety D/B Push Button for WWD Devices at Interstate Ramps
Bidding

Street Resurfacing and Miscellaneous Roadway Improvements
Term Contract
Bidding
$650,000 est. value
Jupiter, FL

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

Park Asphalt Overlay and New Parking at John Stretch Memorial Park, Haverhill Park and Glades Pioneer Park
Post-Bid
Haverhill, FL 33415

WPB Callaway Resurface POV Parking
Results
West Palm Beach, FL 33406

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Public Works Annual Pathways and Minor Construction
Term Contract
Bidding
Wellington, FL

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

Parking Lot Seal Coating at Jupiter Community Park
Results
Jupiter, FL 33458

Pelican Preserve Nature Walk Repair Project
Post-Bid
Palm Beach Gardens, FL

Bike Lane/Sidewalk/Pedestrian Detectors
Results
Less than $304,785 est. value
FL

Phase I of Replacement and Installation of Sidewalks
Post-Bid
Pahokee, FL

Asphalt Sidewalk/Fencing
Results
Less than $304,597 est. value
FL

Asphalt Sidewalk and Driveway
Post-Bid
West Palm Beach, FL

Glades Road Library - Parking Lot Maintenenace
Term Contract
Results
Less than $225,000 est. value
West Palm Beach, FL 33434

Last Updated 11/23/2020 12:26 PM
Project Title

Asset Maintenance Services State Road 9 (I-95) Corridor throughout Palm Beach County

Physical Address View project details and contacts
City, State (County) FL   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,606,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This performance-based contract requires diligent inspection, effective management, and efficient performance of maintenance on all components of the transportation facility as identified herein. In performing the duties under the terms of this contract the Contractor is, by extension, representing the department’s work force for the areas and assets specified in this contract. Unless otherwise exempt, all maintenance activities within the limits of this contract are to be performed by the Contractor.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents