Similar Projects
Taylors Creek Extension
Infrastructure
Bidding
Hinesville, GA

Water Meter Replacement
Infrastructure
Bidding
$500,000 est. value
McCaysville, GA

Automated Metering Infrastructure
Post-Bid
Temple, GA

Water Meter Testing Services
Term Contract
Post-Bid
Gainesville, GA

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

2019 CDBG Water System Improvements
Results
Milan, GA 31060

Water System Improvements, Bass Cross Road Water Line
Infrastructure
Bidding
$800,000 est. value
Hogansville, GA 30230

Line Creek Transmission Main and Distribution System
Infrastructure
Post-Bid
$8,500,000 est. value
GA

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

Water System Improvement - Materials Only
Infrastructure
Bidding
Ludowici, GA

Water Main Extension for Construction Activities
Infrastructure
Post-Bid
Bainbridge, GA

Baxley Water Meter Citywide Replacement
Results
Baxley, GA

Pipe and Materials for CDBG Waterline Project
Infrastructure
Bidding
Clayton, GA

AMR Water Meter Replacement
Infrastructure
Post-Bid
Warwick, GA

Annual Labor - Water Line Installation
Term Contract
Results
McDonough, GA

Last Updated 06/20/2022 02:34 AM
Project Title

Fire Hydrant Installation At Dalton Municipal Airport

Physical Address View project details and contacts
City, State (County) Dalton, GA 30721   (Whitfield County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope includes all necessary materials and labor to install a fire hydrant which meets current fire code for fire hydrant proximity to the proposed hangar structures, including but not limited to, standard pit and 8” double-check backflow device, hydrant(s) and all required piping and fittings. Contractor is encouraged to propose whatever is necessary to best meet project objective.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents