Similar Projects
PCC Box Culverts - 287 and 291
Infrastructure
Bidding
Crookston, Euclid, MN

PCC Box Culverts
Infrastructure
Bidding
MN

NLH Pond Kettle Repair
Post-Bid
New London, MN 56273

Bluff 25 Culvert Replacement
Post-Bid
Eden Prairie, MN

Directional Boring
New Construction
Results
Minneapolis, MN 55401

Centerline Culvert Replacement with Culvert, Approach Grading, Aggregate Base, Bituminous Paving, Aggregate Shouldering and Striping
Results
$296,335 est. value
MN

Silver Ramp Corrective Work
Alteration
Bidding
Minneapolis, MN

Butler Road - Culvert Replacement
Post-Bid
MN

Cranberry WMA - Dike Modifications
Results
Braham, MN

Goodview Avenue Water Main Extension
Infrastructure
Bidding
Cottage Grove, MN 55016

Watonwan and Brown County Judicial Ditch No. 18 Improvements Bid Package 3
Post-Bid
$407,000 est. value

2020 Rosemount Pond Maintenance
Results
Rosemount, MN

Grading, Bituminous Surfacing, ADA Improvements, Pedestrian Crosswalk Flasher System, Roundabouts, Lighting and Retaining Walls
Infrastructure
Bidding
MN

Ryan Drive and Keller Parkway Conveyance Upgrades
Post-Bid
$808,000 est. value
Little Canada, MN 55117

North Fork Zumbro River at Mazeppa Channel Restoration
Results
Wabasha, MN

Reported 03/17/2022 12:00 AM
Project Title

Marion Rest Area Drainfield Replacement

Physical Address View project details and contacts
City, State (County) Eyota, MN   (Olmsted County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $476,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Location: Interstate 90 West Bound I90 Westbound, MP 222 near Eyota, MN 1. Install new treatment tank, treatment unit, blower, and drainfield mounds. 2. Install new electrical and control conduit/wiring from building to a new control panel located at the existing lift station. 3. Providing temporary fencing and signage to protect the construction site and the public. 4. Excavate for tank and piping from manhole to drainfield mounds. Rock (limestone) excavation is anticipated at the treatment tank location and for the forcemain excavations. All rock encountered is to be removed from the site and replaced with imported backfill. 5. Erosion control and final turf restoration.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents