Similar Projects
Water System Improvement - Materials Only
Infrastructure
Bidding
Ludowici, GA

Pipe and Materials for CDBG Waterline Project
Infrastructure
Bidding
Clayton, GA

Annual On-Call Water and Sewer Emergency Repair
Term Contract
Post-Bid
Stockbridge, GA

Heron Bay Force Main D
Post-Bid
Marietta, GA

Replacement and Installation of Fire Hydrants Standby-Miscellaneous Construction
Results
Less than $100,000 est. value
GA 30303

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

Georgia War Veterans Home Site Infrastructure
New Construction, Infrastructure
Bidding
$700,000 est. value
Milledgeville, GA 31061

Russell Creek 30-inch Raw Water Pipeline
Post-Bid
Dawsonville, GA

South Annexation - GEFA Phase III Infrastructure
Results
Richmond Hill, GA 31324

2023 Blow-Off Replacements
Infrastructure
Bidding
$2,000,000 est. value
Marietta, GA

Automated Metering Infrastructure
Post-Bid
Temple, GA

Annual Labor - Water Line Installation
Term Contract
Results
McDonough, GA

Water and Sewer Underground Enclosures
Infrastructure
Bidding
Atlanta, GA

Water Meter Testing Services
Term Contract
Post-Bid
Gainesville, GA

Capps Ferry Lift Station and Force Main
Results
$2,313,122 est. value
GA

Last Updated 06/20/2022 06:53 AM
Project Title

Distribution System Small Line Replacement Program - Package 1

Physical Address View project details and contacts
City, State (County) Columbus, GA   (Muscogee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the replacement of approximately 5,400 linear feet of existing distribution system potable water mains 6-inches and smaller with 8-inch Ductile Iron Pipe (DIP) with accompanying water main appurtenances, connections to existing piping, and residential connections. The five (5) project areas identified as part of this project will be located entirely within the City of Columbus Right-of-Way. This project will be funded through the Georgia Environmental Finance Authority (GEFA) Drinking Water State Revolving Fund (DWSRF)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts