Similar Projects
Tommy's Express Car Wash - P2266 & CARite Dealership
New Construction - 9,274 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Grand Rapids, MI 49548

Twister Car Wash
Renovation
Design
Roseville, MI 48066

Tommy's Quality Car Wash - Headquarters and Car Wash
New Construction - 276,624 SF
Design
$25,000,000 est. value
Holland, MI 49055

R & L Carriers Detroit Terminal Expansion & Renovation
New Construction, Renovation, Addition - 85,400 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Ypsilanti, MI 48198

Delta County Airport - New Car Wash Building
New Construction - 635 SF
Post-Bid
Less than $500,000 CJ est. value
Escanaba, MI 49829

Car Wash Services
Post-Bid
MI

Insite Logistics Facility - Project Viper
New Construction - 138,435 SF
Pending Verification
$10,000,000 CJ est. value
Romulus, MI 48174

Tommy's Express Car Wash - Westland
New Construction - 5,243 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Westland, MI 48185

Green Mitt Car Wash
New Construction - 4,983 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Traverse City, MI 49686

Tommy's Express/Quality Car Wash
New Construction, Demolition - 4,553 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Byron Center, MI 49315

Zippy Auto Wash
New Construction - 4,843 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Ypsilanti, MI 48197

Last Updated 08/03/2021 05:36 AM
Project Title

DPS Vactor Pad and Washbay Project

Physical Address View project details and contacts
City, State (County) Rochester Hills, MI   (Oakland County)
Category(s) Commercial
Sub-Category(s) Car Wash
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Part A: DPS Washbay The scope of work includes: Removing an existing trench drain system inside the DPS Garages Washbay and replacement with a larger system. The existing and proposed trench drain system is depicted in Appendix B. Work includes saw cutting and removal of the existing material/concrete around the two trench drains as well as its piping. Replacement with a larger trench drain system including pipes and a new catch basin. Part B: DPS Vactor Pad The scope of work includes: installation of a concrete vactor pad with trench drain, retaining walls, 3,000 gallon sanitary structure with weir wall, water service, yard hydrant and concrete pavement restoration within the City’s DPS facility yard.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents