Similar Projects
Bridge Replacements and Highway Intersection Reconstruction
New Construction, Infrastructure
Bidding
ME

Bridge Replacements and Highway Intersection Reconstruction
New Construction, Infrastructure
Bidding
Old Town, ME

2021 Road Paving Program
Post-Bid
Pittsfield, ME

2021 Summer Paving Projects
Post-Bid
Madison, ME

Gravel Road Construction
Results

Gravel Road Construction
Results

Pavement Milling, Cyclical Pavement Resurfacing with Drainage Improvements
Infrastructure
Bidding
Enfield, Lee, Lincoln, ME

Pavement 2021 Project
Infrastructure
Post-Bid
Brewer, ME

Pavement Milling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements
Results
Old Town, ME

2022 Paving Projects
Infrastructure
Bidding
Hampden, ME

Paving
Infrastructure
Post-Bid
Medway, ME 04460

Pavement Milling, Hot Mix Asphalt Overlay, Ultra - Thin Bonded Wearing Course with Drainage and Safety Improvements
Results
Less than $4,403,000 est. value
Medway, ME

Hometown Health Center Route 2 Utilities & Tractor Supply Driveway Widening
Term Contract
Bidding
Palmyra, ME 04965

Levinson Center Paving Project
Infrastructure
Post-Bid
Bangor, ME 04401

Pavement Milling, Ultra - Thin Bonded Wearing Course, with Drainage and Safety Improvements
Results
Less than $1,965,000 est. value
Bingham, Caratunk, Moscow, ME

Last Updated 03/31/2022 03:09 AM
Project Title

Hot Mix Asphalt Overlay with Drainage and Safety Improvements

Physical Address View project details and contacts
City, State (County) Newport, Palmyra, Pittsfield, ME (Penobscot, Somerset Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Maine Federal Aid Project No. 2413300, Win 24133.00. Location: In Penobscot And Somerset Counties, Project Is Located On Us Route 2 Beginning In Pittsfield 0.03 Of a Mile Northeast Of Pooler Road And Extending East 9.00 Miles To Newport. Including 0.32 Of a Mile On Us Route 2w. Outline Of work: Hot Mix Asphalt Overlay With Drainage And Safety Improvements, And Other Incidental Wor

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents