Similar Projects
GAOA-Paintrock Road (Nfsr #17) Road Reconstruction
Term Contract
Design
$20,000 to $500,000 est. value
Shell, WY

Structure, Grading, Bituminous Surfacing, Traffic Control, Surfacing, Fencing and Miscellaneous Work
New Construction, Infrastructure, Alteration
Bidding
Manderson, Worland, WY

Structure, Grading, Bituminous Surfacing, Traffic Control, Surfacing, Fencing and Miscellaneous Work
New Construction, Infrastructure, Alteration
Bidding
Manderson, Worland, WY

WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Post-Bid
Jackson, Teton Village, WY 83001

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Mill and Overlay, Right-of-Way Fence Replacement
Infrastructure
Bidding

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Chip Sealing, Overlay
Infrastructure
Bidding

Burgess Road (Nfsr #15) Road Improvements
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Sheridan, WY 82801

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Chip Sealing
Infrastructure
Bidding

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

Reported 04/08/2022 12:00 AM
Project Title

North 4th Street Improvements Project

Physical Address View project details and contacts
City, State (County) Douglas, WY 82633   (Converse County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of milling and overlaying approximately 600 L.F. of 4th Street. The project begins on the north side of Antelope Creek and consists of 4" cold milling and 4" fiber-reinforced asphaltic pavement overlay including subgrade repair if necessary, and traffic control striping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents