Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Foothills Elementary Front Office Cabinets and Countertops
Post-Bid
Maryville, TN 37803

Wood Utility Poles
Term Contract
Post-Bid
Maryville, TN 37801

Athletic Lockers for Blount County
Alteration
Results
Maryville, TN 37804

Heritage HS Ceiling Tile Installation
Renovation, Alteration - 55,335 SF
Results
Maryville, TN 37804

SWC 436 Lamps, Batteries and Scrap Metal Recycling
Term Contract
Post-Bid

2021 Interior Construction Utility Maintenance Building
Alteration
Results
Friendsville, TN

Electrical Services
Term Contract
Post-Bid
Maryville, TN 37804

Hanger Fans
Term Contract
Post-Bid

Construction of 500 KV and 230 KV Substations and Transmission Lines
New Construction, Alteration
Post-Bid

Stock Material
Term Contract
Post-Bid

Network Transformers
Alteration
Post-Bid
Maryville, TN

Generator
Alteration
Post-Bid
Townsend, TN

Athletic Lockers for William Blount High School
Term Contract, Alteration
Post-Bid
Maryville, TN 37801

Duncan Substation Battery Replacement
Alteration
Post-Bid
Alcoa, TN

Reported 04/21/2022 12:00 AM
Project Title

Ceiling Tile and Lighting Installation

Physical Address View project details and contacts
City, State (County) TN   (Blount County)
Category(s) Single Trades
Sub-Category(s) Electric, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase and installation of ceiling tiles and lighting required in the Board's schools. Ceiling Tile and Lighting Installation Blount County, TN on behalf of the Blount County Board of Education is accepting sealed bids for the removal, purchase and installation of ceiling tiles and lighting required in the Board's schools. Blount Co. Government. does not discriminate based on race, color or national origin in federal or state sponsored programs, pursuant to Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d). Question Cutoff Date: 4/5/2022 12:25 PM (ET) Blount County Government on behalf of the Blount County Board of Education (herein collectively referenced as the "County") is issuing this bid (ITB No. 2021-0128) seeking to engage with qualified persons and/or companies to provide removal and replacement of ceiling tiles and lights with new ceiling tiles and 3500K LED light fixtures in designated areas of Blount County, TN's Schools on an "as needed" basis. The awarded contractor(s) shall be referenced herein as "Contractor" and each service requested may result in multiple Contractor(s) being awarded. This project will begin in the Blount County, TN high schools listed below: Eagleton College and Career Academy located at 2610 Cinema Drive, Maryville, TN 37804 Heritage High School located at 3741 E. Lamar Alexander Pkwy, Maryville, TN 37803 William Blount High School located at 219 County Farm Road, Maryville, TN 37801 This solicitation requires the removal and replacement of Ceiling Tiles and lights with new tiles and 3500K LED light fixtures in designated areas of Blount County, TN's Schools on an "as needed" basis. See Exhibit "A" for each school's specifications. Building areas to be serviced, square footages and a document containing flooring diagrams of each school are included in the exhibit. The diagrams are color coded to indicate the rooms to have ceiling tiles and lighting replacements (the yellow spaces in Exhibit A will receive the new product). All existing ceiling tiles and lights are to be removed from the ceiling grid and disposed of by the awardee of this bid. Specifications for the selected tile to be used appear in Exhibit "A". The awarded Contractor will be responsible for all labor, tools, equipment, materials, supplies and proper disposal of all trash associated with the completion of this job. The awarded Contractor is also responsible for ensuring a clear, clean safe work area both while working and after leaving for the day. The only grid replacement for this project will at the William Blount High School in the areas where the tiles or lighting are changing from a 4 x 4 trapezoid area to a flat surface comprised of one 2x4 ceiling tile and one 2 x 4 light fixture with an addition of a cross brace to realign the grid and complete the modification.

Details

Division 09 - Finishes.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents