Similar Projects
Blueberry Pipe Replacement - City of Richmond Hill
Infrastructure
Conception
$313,000 CJ est. value
Richmond Hill, GA 31324

The Bottom Pipe Replacement - City of Richmond Hill
Infrastructure
Conception
$606,000 CJ est. value
Richmond Hill, GA 31324

I-95 at SR 25 and I-95 Sb and Nb at Ogeechee River - Bridge Rehab
Infrastructure
Design
$3,000,000 CJ est. value
Ellabell, GA 31308

I-95 at SR 25 and I-95 Sb and Nb at Ogeechee River - Bridge Rehab
Infrastructure
Design
$3,000,000 CJ est. value
Ellabell, GA 31308

2023 Road Resurfacing Project
Infrastructure
Bidding
$200,000 CJ est. value
Pembroke, GA 31321

2023 Road Resurfacing Project
Infrastructure
Bidding
$200,000 CJ est. value
Pembroke, GA 31321

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

Rosemont Street Extension
Infrastructure
Results
Richmond Hill, GA

2022 LMIG
Infrastructure
Results
$600,000 est. value
Evans, GA

Highway 17 Vehicle Repair Business
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Richmond Hill, GA 31324

Highway 17 Vehicle Repair Business
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Richmond Hill, GA 31324

Hyundai Motors Electric Vehicle And Battery Manufacturing Plant
New Construction, Infrastructure
Pending Verification
$5,500,000,000 CJ est. value
Ellabell, GA 31308

Savannah Health Services Freestanding Emergency Department - Rabbit Hill Rd & Port Royal Rd / Richmond Hill
New Construction, Infrastructure - 12,760 SF
Pending Verification
$10,228,210 CJ est. value
Richmond Hill, GA 31324

VyStar Credit Union / Richmond Hill
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Richmond Hill, GA 31324

Last Updated 04/06/2023 09:33 AM
Project Title

RFP D/B - US 280 / SR 30 Widening and Interchange Improvements

Physical Address View project details and contacts
City, State (County) Ellabell, GA 31308   (Bryan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Georgia DOT intends to solicit responses for design and construction services for the widening of US 280 / SR 30 will be from two lanes to four lanes with a median between Olive Branch Road and Oracal Parkway. The Design-Builder will also be responsible for constructing five multi-lane roundabouts where US 280 intersects with Oracal Parkway, Frontage Road, Dillon Drive, and the I-16 Westbound and Eastbound ramps. This project will be awarded to a Design-Builder utilizing a One-Phase Low Bid (Shortlist) method. A Design-Builder includes a Lead Contractor and a Lead Design Consultant working together to design and construct the project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents