Similar Projects
Fire Exhaust Fans
Post-Bid
Taylor, MI

Pellston Regional Airport Air-Cooled Scroll Water Chiller
Post-Bid
Petoskey, MI

Roseville - Mechanical Renovations - BP07
Results
Roseville, MI

Heating, Ventilation and Air Conditioning (HVAC) Equipment and Building Control Systems Maintenance
Results
Less than $142,000 est. value
Wayne, MI

2019 HVAC Improvement Project
Term Contract
Post-Bid
Less than $616,000 est. value
Niles, MI 49120

East Lansing High School Plumbing And Hvac Improvements
Results
Lansing, MI 48900

Retrofits to Existing Roof-Top Units Serving Science Labs
Post-Bid
Saint Joseph, MI

IT Server Room Cooling Unit at the Irwin L. Davis Instructional Center
Results
Flint, MI 48507

A/C System Install - Air Conditioning System Installation for Gilbert Lodge
Post-Bid
Traverse City, MI

M and M Chiller Replacement
Results
Less than $50,000 est. value
Houghton, MI

Schembechler Glenn E Hall – HVAC Upgrades
Post-Bid
Ann Arbor, MI

HVAC Contractor Services
Term Contract
Results
Detroit, MI 48226

Hood Cleaning and Degreasing Services
Term Contract
Post-Bid
Rochester, MI

Foundry Ventilation Upgrades
Results
Less than $50,000 est. value
Houghton, MI

HVAC Preventative Maintenance Program
Post-Bid
Saline, MI

Reported 11/19/2020 12:00 AM
Project Title

LHS York 300 Ton Chiller

Physical Address View project details and contacts
City, State (County) Battle Creek, MI 49015   (Calhoun County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Lakeview High School’s cooling system consists of a three compressor air cooled chiller that has a BAC ice maker with storage tanks. Due to its ice making capability it is important to note that any new chiller needs to operate at a lower temperature in order to freeze ice at night, and then a normal operating temperature during the day. Lakeview schools will consider other units that are of equal or better quality to our current unit. Bid pricing shall be all-inclusive for turn-key installation services to include removal and disposal of existing chiller, purchase and installation of new chiller, all overhead, labor, travel time, per diem, materials, supplies, equipment, standard warranty period, requested extended warranty, maintenance during warranty period, insurance, taxes, permits, etc.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents