Similar Projects
Last Updated | 04/29/2021 01:39 PM |
Project Title | Cenntennial Link Trail |
Physical Address | View project details and contacts |
City, State (County) | Centennial, CO (Arapahoe County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work performed under this contract generally consists of construction of trail from the north side of East Caley Avenue north through an existing utility corridor and crossing East Orchard Road and connecting to the High Line Canal Trail. The project includes the demolition of existing trail, curb and gutter, and pavement. Proposed improvements include earthwork, grading, concrete and asphalt pavement installations, sidewalk, curb and gutter, curb ramp installation, striping, signing, seeding, temporary traffic control, and temporary/permanent stormwater management BMPs. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |