Similar Projects
RFP D/B - Design/Build Services for HVAC Automation Control Upgrades
Renovation
Bidding
$3,685,500 CJ est. value
Stone Mountain, GA 30083

Phase 2 of Chiller Replacement
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Athens, GA 30605

RFP General Contractor - HVAC and Controls Replacements
Renovation
Sub-Bidding
$460,000 CJ est. value
Decatur, GA 30030

On-Call HVAC Maintenance and Repair Services
Alteration
Post-Bid
Savannah, GA

TAB Services for Facility HVAC System
Alteration
Post-Bid
Augusta, GA

Multiple HVAC Replacements at Multiple County Locations
Alteration
Results
$377,606 est. value
Canton, GA 30114

Upgrade to Siemens Desigo CC BAS Systems
Term Contract
Results
Athens, GA 30605

Replace Air Handling Unit (AHU) - Building 39
Renovation
Sub-Bidding
$4,000,000 CJ est. value
Athens, GA 30605

HVAC Maintenance for Water Treatment Facilities
Term Contract
Post-Bid
Savannah, GA

Energy Efficiency and Infrastructure Upgrades
Renovation
Results
$2,848,860 est. value
Atlanta, GA 30310

Deliver & Install Brand Name or Equivalent HVAC
Term Contract
Sub-Bidding
Athens, GA 30605

UGA - FMD Animal Health Research Center Maintenance Contract
Term Contract
Post-Bid
Athens, GA

Bi-Polar Ionization System Replacement Project
Alteration
Results
Atlanta, Milton, GA 30350

Annual Preventive Maintenance Service Agreement and Repairs on Heating and Air Conditioning Services
Term Contract
Post-Bid
Augusta, GA

Sonoraville High School HVAC Modification
Alteration
Results
$325,000 est. value
Calhoun, GA 30701

Last Updated 07/20/2023 05:39 PM
Project Title

Health and Physical Education Complex Boiler Replacement

Physical Address View project details and contacts
City, State (County) Fort Valley, GA 31030   (Peach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders are cautioned that acquisition of Bidding Documents through any source other than the office of the Design Professional is not advisable. Acquisition of Bidding Documents from unauthorized sources places the bidder at risk of receiving incomplete or inaccurate information upon which to base a bid. The Contractor shall furnish all the materials, perform all of the Work, and do all things required by the Contract Documents.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents