Similar Projects
HVAC and Mechanical Products
Term Contract
Bidding

HVAC and Mechanical Products
Term Contract
Bidding

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Radio Tower Air Conditioner Replacement
Alteration
Bidding
Inver Grove Heights, MN

Hennepin County Public Works -CMED Cooling
Post-Bid
Medina, MN 55340

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Furnace & Air Conditioner Replacement
Alteration
Bidding
Eagan, MN 55123

Facility HVAC Services
Post-Bid
Burnsville, MN

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

HVAC and Mechanical Products and Solutions
Term Contract
Bidding

J041--Chiller Maintenance 36C26318f0324 - 618C00184 - (Va-21-00015466)
Post-Bid
Minneapolis, MN

Washington Elementary School HVAC Improvements
Results
Mankato, MN 56001

Reported 05/14/2021 12:00 AM
Project Title

Chilled Water System Replacement

Physical Address View project details and contacts
City, State (County) Moorhead, MN 56563   (Clay County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $500,000 to $593,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project is to replace an existing water-cooled chiller system at MSUM’s Center for the Arts with a new air-cooled chiller system. This work would include the complete demolition of the existing cooling tower and condenser water piping system, as well as the existing chiller, and replacing it with a new air-cooled chiller. The predesign identified the need of a new 300-ton chiller, but this is to be verified by design team using Future Weather Files instead of historical weather files. Minnesota B3 requires the Intergovernmental Panel on Climate Change, Fifth Assessment Report, 2014 prediction, RCP 8.5, 50th percentile out to 2040, which should be used for this project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents