Similar Projects
Wansford Yard Lift Station - Phase 1
New Construction
Bidding
$20,384,600 est. value
Evansville, IN

Construction of Contract "A" - Main Street Regional Lift Station
New Construction
Bidding
$4,750,000 est. value
Whitestown, IN

Water Utility Improvements, Division "C" - Phase 3
Post-Bid
Crown Point, IN 46307

Lake Station Crossroads Lift Station Replacement, Lake Station, Lake County, Indiana (Usace Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Daylight South Lift Station Rehab
Results
Evansville, IN 47708

Holy Cross Parkway Lift Station Screening Improvements
Results
Mishawaka, IN 46545

Southeast Sanitary Sewer Improvements Phase 3 -Lift Station and Force Main Replacement Project
Renovation, Infrastructure
Bidding
Columbus, IN

Perry Crossing Lift Station Rehabilitation
Post-Bid
Sellersburg, IN

Gathings Lift Station Improvements
Results
Fort Wayne, IN 46800

Hospital and Industrial Park Lift Station Improvements
New Construction, Infrastructure
Bidding
Sullivan, IN

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Golfview Pump Station Replacement
Results
Jeffersonville, IN 47129

Cane Run Flood Control Pumping Station 5
Post-Bid
$5,000,000 to $6,000,000 est. value
Jeffersonville, IN

West Regional Lift Station
Results
$500,000 to $1,000,000 est. value
Zionsville, IN

Wastewater Treatment Plant And Lift Station Upgrade
Post-Bid
Rochester, IN

Last Updated 03/01/2022 10:02 AM
Project Title

County Road 4 Extension Between County Roads 17 and 19: Lift Station Materials Contract

Physical Address View project details and contacts
City, State (County) Goshen, IN   (Elkhart County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Itemized materials: Item 1 Submersible Wastewater Pump Package Item 2 10’ Diameter Concrete Wet Well, 40ft rim to floor Item 3 Model S1R3660 Access Door Item 4 8’ Diameter Concrete Wet Well, 10ft rim to floor Item 5 Model W1R3636 Access Door Item 6 Control System Item 7 Flowmeter Item 8 Transducer Item 9 Redundant Pump Control (Backup Control) Item 10 Telemetry Unit Item 11 DI Discharge Pipe (8”) Package Item 12 8” Check Valve Item 13 8” Plug Valve Item 14 8” x 6” Tee Item 15 6” PVC Pipe Item 16 4” PVC Pipe Item 17 Portacon Quick Connect Fitting with Male 6” Quicklock Connector

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents