Similar Projects
Magnolia Preparatory Academy
New Construction - 16,786 SF
Design
$2,200,000 est. value
Katy, TX 77493

The Learning Experience
New Construction - 10,000 SF
Design
$2,750,000 est. value
Frisco, TX 75034

Meridith-Dunbar Early Childhood Academy
Post-Bid
Temple, TX 76501

New Primary School Phase 1 Project
New Construction - 80,000 SF
Post-Bid
Less than $15,000,000 est. value
Austin, TX 78744

TISD Burnett Head Start Renovation
Renovation
Results
Terrell, TX 75160

James R. Vasquez Head Start Center Classroom Addition
Addition
Results
$1,000,000 est. value
El Paso, TX 79936

Ivy Kids Early Learning Center
New Construction - 15,484 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Manvel, TX 77578

Ivy Kids Learning Center
New Construction - 18,022 SF
Construction
$3,000,000 est. value
McKinney, TX 75035

Child Care Center
Addition - 3,500 SF
Design
$192,500 est. value
Houston, TX 77065

Pinnacle Montessori of Oak Point
New Construction - 17,530 SF
Post-Bid
$3,000,000 est. value
Oak Point, TX 75068

New Early Childhood Center Number 1
New Construction - 78,000 SF
Results
Less than $21,500,000 est. value
Houston, TX 77072

Day Care Center
New Construction
Construction
McKinney, TX 75070

Pinnacle Montessori Academy
New Construction - 12,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fort Worth, TX 76179

Montessori Day Care
New Construction - 9,597 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Austin, TX 78750

Kids R Kids
New Construction
Construction
$3,000,000 est. value
Tomball, TX

Reported 01/08/2021 12:00 AM
Project Title

Design Build Child Development Center, Lackland AFB, Texas

Physical Address View project details and contacts
City, State (County) TX   (Bexar County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A large Child Development Center (CDC) at JBSA Lackland utilizing the standard design (9,189 SM). Construction will include child development areas for infants, pre-toddlers, toddlers, preschoolers, administrative space, lobby areas, public restrooms, storage rooms, kitchen and equipment, playground areas and equipment, security system, CCTV, utilities, concrete foundation, concrete floor slabs, structural steel frame, masonry walls, standing seam metal roof, parking, driveway and all associated support. This project will also include the demolition of Building 2602 (722SM).

Details

,, 9,911 SF - Pre-School/Daycare, 9,189 SF New Construction, Pre-School/Daycare, 722 SF Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents