Similar Projects
Centerline Joint Repair on IL 8/US 150
Infrastructure
Bidding
$600,000 CJ est. value
East Peoria, IL 61611

Centerline Joint Repair on IL 8/US 150
Infrastructure
Bidding
$600,000 CJ est. value
East Peoria, IL 61611

Applying Oil and Chip at Various Maintenance Yards
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Morton, IL 61733

Applying Oil and Chip at Various Maintenance Yards
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Morton, IL 61733

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RR-21-4821 Pavement Repairs
Infrastructure
Results

Fire Station 1 Parking Lot Rework
Infrastructure
Results
Pekin, IL 61554

Roadway Extension of Freedom Parkway
Infrastructure
Bidding
$600,000 CJ est. value
Washington, IL 61571

Commodities And Services
Term Contract, Alteration
Post-Bid
Washington, IL 61571

Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge
Infrastructure
Results
IL

Superstructure Replacement Parkview Dr. & Palmer Ave. over Addison Creek
Demolition, Infrastructure
Bidding
$700,000 CJ est. value
Morton, IL 61733

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
South Pekin, IL

Pavement Patching and Hma Overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co Line
Infrastructure
Results
IL

Architectural Barriers Removal-Sidewalks
Infrastructure
Post-Bid
Armington, Creve Coeur, Delavan, East Peoria, Mackinaw, Minier, South Pekin, Washington, IL

Last Updated 04/26/2023 01:08 AM
Project Title

Street Reconstruction

Physical Address View project details and contacts
City, State (County) Washington, IL 61571   (Tazewell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,037,548 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 25, 2023, this project has been awarded to Stark Excavating in the amount of $2,037,548.45. Project Consists of Street Reconstruction Including Earthwork, Pavement Removal, Aggregate Base Course, Hma or Pcc Pavement, Curb & Gutter, Pcc Sidewalks, Pcc Driveways, Storm Sewer, Sanitary Sewer System, Water System, and Landscaping. Project Location: c. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Street Reconstruction - 20-00129-00-PV IDOT pre-qualification required.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents