Similar Projects
Cornhusker Highway Entryway Corridor Improvements - 409457 - City of Lincoln
Infrastructure
Conception
$1,500,000 CJ est. value
Lincoln, NE 68504

Wilderness Hills Development Trail (YHR - 27th/40th) - I.F. Zone 6 - City of Lincoln
Infrastructure
Conception
$1,170,000 CJ est. value
Lincoln, NE 68516

Gravesite Expansion Fort McPherson National Cemetery Maxwell
Addition, Infrastructure
Design
$5,000,000 CJ est. value
Maxwell, NE 69151

Bituminous, General (All Classes)
Infrastructure
Design
$13,319,820 CJ est. value
Verdon, NE 68457

Riverfront Trail IV - Millers Landing to Kiwanis Parks
Infrastructure
Bidding
$1,095,000 CJ est. value
Omaha, NE 68102

Site Grading, Retaining Wall, and Drive Entrance
Infrastructure
Bidding
$600,000 CJ est. value
Omaha, NE 68102

Pauline West Slab Bridge
New Construction, Infrastructure
Post-Bid
NE

I-76 Girder Repair
New Construction, Infrastructure
Post-Bid
$5,000,000 est. value
NE

Repair Bridge 16
Renovation, Demolition
Results
$25,000 to $100,000 est. value
Clay Center, NE 68933

Bridge
New Construction
Results
$80,000 to $299,000 est. value
Grand Island, NE

Streetcar Line - City of Omaha
Infrastructure
Pending Verification
$354,000,000 CJ est. value
Omaha, NE 68131

Bridges Repair County of Madison
Infrastructure, Renovation
Pending Verification
$500,000 CJ est. value
Norfolk, NE 68701

Fletcher Landmark Trail Phase 1 - Zone 2 - City of Lincoln
Infrastructure
Conception
$495,000 CJ est. value
Lincoln, NE 68521

East Viaduct Project - City Of Lexington
Infrastructure
Design
$9,600,000 CJ est. value
Lexington, NE 68850

Cowboy Trail - Bridge Decking
Infrastructure
Bidding
$700,000 CJ est. value
Norfolk, NE 68701

Last Updated 02/03/2023 03:12 PM
Project Title

Bell Street Viaduct Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Fremont, NE 68025   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a bridge rehabilitation project and associated street work in Fremont, Nebraska and other work incidental thereto. The sealed bids are to be plainly marked "Attention: Fremont City Clerk, Bell Street Viaduct Rehabilitation Project, Project No. BR-11-22 - Structure No. U095014510". The work shall include all labor, materials, transportation, and equipment required for the construction of: Sta. 36+72 Rehabilitate Viaduct and Rehabilitate, Repair, or Replace Adjacent Roadway and Sidewalks. Proposals must be signed and submitted on the forms furnished with the Bid Documents. PLEASE ONLY SUBMIT DIVISION 5. Each bidder will be required to submit with his proposal a Bid Bond or Certified Check made payable, without condition, to the City of Fremont, Nebraska, in an amount equal to five (5) percent of his proposal. The bidder will include an estimated time of beginning and completion for the project with the proposal. The Contractor will be allowed 160 calendar days for the completion of the work. The City of Fremont reserves the right to reject any and all bids and to waive any irregularities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents