Similar Projects
Poughkeepsie Storage
New Construction, Demolition - 88,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Poughkeepsie, NY 12601

Extra Space Storage
New Construction - 160,900 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pearl River, NY 10954

Rosetti Warehouse
New Construction - 54,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Latham, NY 12110

Exit 9 Self Storage - Phase II
New Construction - 37,526 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Clifton Park, NY 12065

Proposed New Location for Central Commissary
New Construction - 60,000 SF
Bidding
$6,490,000 est. value
Buffalo, NY 14215

2022 Pole Barn
New Construction
Bidding
$103,000 est. value
Sherrill, NY

Extra Space Storage Facility
New Construction - 156,554 SF
Post-Bid
$10,000,000 CJ est. value
Elmsford, NY 10523

21 Drum Hazmat Storage
New Construction
Post-Bid
Westhampton Beach, NY

Batavia Downs Gaming Warehouse
New Construction
Results
$600,000 est. value
Batavia, NY 14020

Montgomery Shared Services Facility
New Construction - 42,250 SF
Results
Fultonville, NY 12072

Beacon HIP Lofts & Storage
New Construction, Renovation, Addition - 555,000 SF
Construction
$8,500,000 est. value
Beacon, NY 12508

Project Sailfish Warehouse Distribution Center
New Construction - 1,015,740 SF
Construction
$85,000,000 est. value
Montgomery, NY 12549

Highland Passive House
New Construction - 12,000 SF
Pending Verification
$4,400,000 est. value
Highland, NY 12528

Wildflower Studios
New Construction
Pending Verification
Astoria, NY

Grumman Road Industrial Development
New Construction, Demolition, Infrastructure - 239,000 SF
Conception
$100,000,000 est. value
Bethpage, NY 11714

Reported 07/19/2022 01:47 PM
Project Title

Guardian Self Storage Facility / Lloyd

Physical Address View project details and contacts
City, State (County) Highland, NY 12528   (Ulster County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $905,250
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a warehouse / distribution facility in Highland, New York. Conceptual plans call for the construction of a warehouse / distribution facility. Plans call for the construction of a 11,675 square foot self-storage facility. As of July 19, 2022, this project is seeking amended site plan approval from the Town of Lloyd Planning Board. Ulster County Planning Board on July 6, 2022, recommended modifications to the plan. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Warehouse/Storage, 11,675 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Fire Protection Specialties, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents