Similar Projects
Design Build Bridging for New Huntsville US Federal Courthouse, Huntsville AL
New Construction - 123,106 SF
Post-Bid
$70,000,000 to $80,000,000 est. value
Huntsville, AL 35801

Butler County Courthouse Elevator & Restroom Renovation
Post-Bid
Less than $300,000 est. value
Greenville, AL

Mountain Brook City Hall Service Mall Renovation
Renovation
Results
Less than $107,751 est. value
Mountain Brook, AL 35213

Redevelopment of Court House Building
Renovation
Results
$3,000,000 est. value
Alexander City, AL 35010

Phelps - Price Justice Center Building Renovations
Renovation
Construction
Less than $13,845,918 est. value
Montgomery, AL 36102

Pike County Judicial Center
Construction
$36,614,470 est. value
Troy, AL

New Town Hall Complex
New Construction
Post-Bid
River Falls, AL

Redevelopment of City Hall Building
Results
Less than $2,747,000 est. value
Alexander City, AL 35011

Municipal Building Project
Renovation - 21,800 SF
Construction
$3,073,673 est. value
Hartselle, AL 35640

Elkmont Town Hall
New Construction - 2,417 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Elkmont, AL 35620

Geneva Courthouse Renovations and Additions
Renovation, Addition
Results
Geneva, AL 36340

Construction of a New City Hall - City of Semmes
New Construction - 12,000 SF
Construction
$1,899,950 est. value
Semmes, AL

FBI Innovation Center
New Construction - 250,000 SF
Post-Bid
$1,300,000,000 est. value
Redstone Arsenal, AL

Design-Build Bridging Construction Services for The New U.S. Courthouse, Huntsville, AL
New Construction - 123,106 SF
Results
$60,000,000 to $70,000,000 est. value
Huntsville, AL

Summerdale City Hall Building Department Renovations
Renovation
Post-Bid
Summerdale, AL 36580

Reported 02/01/2022 11:52 AM
Project Title

New City Hall

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35801   (Madison County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $76,811,166
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction of a 7-story administrative building and 7-level parking structure. Both structures will be comprised of precast clad, poured in place concrete framed structures. The administrative building will be served by a hydronic, 4 pipe system utilizing gas fired boilers, water cooled chillers, and roof top cooling towers. The administrative building and parking deck share a primary electrical system and emergency generator, to be located at the top level of the parking structure. The combined structures will replace the existing city parking garage located at 253-309 Fountain Circle SW. The project includes demolition of the existing parking garage and all associated structures and utilities. The project also includes all sitework, deep foundations, utilities, sight lighting, landscape and hardscape necessary to complete the project.

Details

Capitol/Court House/City Hall, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents