Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

2021-2022 Contract Services Annual Notice and Instructions
Infrastructure
Bidding
Phoenix, AZ

Engineering Services Carefree Hwy: Cave Creek Rd To Scottsdale Rd
Term Contract
Bidding
$934,328 est. value
Scottsdale, AZ

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

On-Call Engineering and Surveying Services
Term Contract
Post-Bid
Litchfield Park, AZ 85340

IDC A-E Services for Horizontal Design Needs Primarily for Department of Homeland Security Nationwide
New Construction, Renovation
Results
Less than $65,000,000 est. value

C--CO, AZ and NM A/E Professional Services IDIQ
Results
$2,500 to $5,000,000 est. value

Rainbow Valley Water Reclamation Facility Expansion
Addition
Bidding
Goodyear, AZ

Citywide Engineering/Consulting On-Call Services
Post-Bid
Phoenix, AZ 85003

A/E Fire Protection Engineering IDIQ
Results

Parks and Recreation Needs Assessment and Master Plan
Term Contract
Bidding
Goodyear, AZ

IDIQ Contract for A-E Services for Architectural and Engineering Work for Oil Management, Waste/Hazardous Material
Post-Bid
Less than $75,000,000 est. value

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Construction Management Services Ocotillo Road Improvements - Gilbert Road to 148th Street
Infrastructure
Bidding
Chandler, AZ 85249

Shade and Streetscape Master Plan
Post-Bid
Gilbert, AZ 85296

Reported 12/17/2021 12:00 AM
Project Title

Storm Water Master Plan

Physical Address View project details and contacts
City, State (County) Gilbert, AZ   (Maricopa County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will develop a comprehensive Storm Water Master Plan for Gilbert which is designated as a regulated municipal separate sewer system (MS4). The Master Plan will be completed in accordance with applicable statutes and requirements and will focus on storm water including, but not limited to: storm water infrastructure, permit compliance and coordination, floodplain mapping, storm water drainage issues, system resiliency, data evaluation, capital planning, future infrastructure impacts, future rate study planning, compliance with the National Pollution Discharge. Elimination System (NPDES) standards, coordination with Maricopa County Flood Control District’s upcoming Gilbert Area Drainage Master Plan and will provide a methodology for regular Storm Water Master Plan updates.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents