Similar Projects
Lane Sanitary Sewer Line Rehabilitation
Bidding
Less than $30,000 est. value
North Versailles, PA

New 8th Avenue Sanitary Sewer Improvements
Bidding
West Homestead, PA 15120

Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Saint Michael Pennsylvania South of Salix Sewer Extension Project - General
Post-Bid
Forest Hills, PA 15221

Shacog Joint Municipal Sanitary Sewer Lining Project
Results
Carnegie, PA

Worcester Drive Sewer Realignment
Results
Carnegie, PA 15106

Moon Golf Club Storage Building - Site Work Construction
Bidding
Moon Township, PA 15108

Ottawa Hills Sewer Rehabilitation Project
Post-Bid
Pittsburgh, PA 15701

2019 Whitehall Borough Sanitary Sewer Excavation
Results
Pittsburgh, PA 15123

2019 Small Diameter Sewer Rehabilitation Contract No. 2 - Brownsville Road Storm Sewer
Bidding
Pittsburgh, PA 15207

Howard Street Sanitary Sewer Inflow Removal Project
Post-Bid
Coraopolis, PA 15108

Shadowlawn Sanitary Sewer HDD Installation
Results
Less than $200,000 est. value
Pittsburgh, PA

2021 CCTV Inspections
Bidding
Pittsburgh, PA

Penn Hills 2020 CCTV Inspection Contracts
Post-Bid
Penn Hills, PA 15235

DPW Building Sanitary and Storm Sewer Relocation
Results
Pittsburgh, PA 15123

Last Updated 11/12/2020 10:41 AM
Project Title

Center Avenue Sanitary Sewer Repair

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15202   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install 60 manhole approximately 20 depth, remove existing manhole approximately 20 depth remove approximately 44 of existing 15 VCP sanitary sewer and replace with approximately 44 of 16 C-900 DR-14 sanitary sewer connection of new 16 C-900 DR-14 sanitary sewer to both existing and newly installed manholes connection of existing 15 cast iron sanitary sewer to new manhole new bench and invert for existing manhole all connections to have water tight seals excavate and remove unsuitable materials as required - to be hauled to a PennDOT approved location outside the city all required pumping and bypass of sewer line during construction back fill trench and manhole per site plan details all excavation E s Compensation must be filed with the executed Agreement.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents