Similar Projects
Depot Street Mixed-Use Development
New Construction, Renovation, Demolition - 6,360 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Ann Arbor, MI 48104

Augusta Bunton Pump Force Main
Post-Bid
$650,000 est. value
Willis, MI 48191

Paving & Site Lighting
Post-Bid

2020 Riveroaks-Keveling Paving Project
Results
Less than $294,535 est. value
Saline, MI

Dunmore, Waverly, Weldon, Hartford Water Main Replacement Project
Results
Ann Arbor, Hartford, Waverly, MI

Costco: Off-Site Parking Lot
New Construction
Construction
$10,000,000 CJ est. value
Ann Arbor, MI 48108

Costco: Off-Site Parking Lot
New Construction
Construction
$10,000,000 CJ est. value
Ann Arbor, MI 48108

A2 Montessori Child Care Center
Renovation
Pending Verification
Ann Arbor, MI 48104

Lillie Park Parking Lot Rehabilitation
Post-Bid
Ann Arbor, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Fire Hydrant Removal and Replacement
Post-Bid
Milan, MI

Women's Huron Valley Correctional Facility - ADA Egress Infrastructure
Results
Ypsilanti, MI 48197

Chemistry and Dow Willard H Laboratory Potable and Non Potable Water Systems Pipe Repairs
Post-Bid
Ann Arbor, MI

Calumet-Swedetown Trail Capping, And Route Grading
Results

Bundle 3 Rest Areas Ada Eastern Lower Peninsula - Exterior
Post-Bid

Last Updated 08/01/2022 12:02 AM
Project Title

Shared Use Path: West Huron River Drive to North Main Street - TR-AT-10-37 - City of Ann Arbor

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48103   (Washtenaw County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will identify access for grade separated improvement under M-14 using M-14 bridge and area adjacent to Amtrak corridor. As of August 01, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents