Similar Projects
2022 Asphalt Overlay for City Streets
Infrastructure
Bidding
$460,000 CJ est. value
De Soto, MO 63020

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Brethold Booster Station and Water Main Extension
Infrastructure
Post-Bid
MO

8 Relocated Water Main - Highway 61-67
Infrastructure
Results
Herculaneum, MO

Pleasant Valley Nature Preserve Electrical and Water Service Installation
Infrastructure, Alteration
Results
Eureka, MO 63025

Brennan Woods Elementary School Watermain Relocate
Infrastructure
Post-Bid
$50,000 est. value
Arnold, MO

Site Improvement Plans for Festus Commons
Infrastructure
Results
$700,000 est. value
Festus, MO

Replace Hot Water Lines
Term Contract
Post-Bid
$500,000 to $2,000,000 est. value
Arnold, MO 63010

2022 Subdivision PCC Panel Replacement
Infrastructure
Results
$695,945 CJ est. value
Hillsboro, MO 63050

North Adams Water Main Project
Infrastructure
Post-Bid
Festus, MO

Sycamore Lane Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$853,508 CJ est. value
Byrnes Mill, MO 63025

2022 Utility Location Services
Term Contract
Post-Bid
Hillsboro, MO

Weaver Road Culvert Outfall Improvements
Infrastructure
Results
$154,284 CJ est. value
Joachim Township, MO 63028

Upper Byrnes Mill Water Main Extension
Infrastructure
Post-Bid
$300,000 est. value
Byrnes Mill, MO 63051

2022 - Elm Drive Stormwater Improvement Project - Phase 2
Infrastructure
Results
$1,772,126 CJ est. value
Hillsboro, MO 63050

Last Updated 09/13/2022 07:32 AM
Project Title

Pipe Replacement

Physical Address View project details and contacts
City, State (County) Hillsboro, MO 63050   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $273,848 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6M3416 Route 30,61/67 JEFFERSON County. Pipe replacement Highway 30 East at Northwest Boulevard and Route 61/67 North at Montebello Road, the total length of improvement being 0.054 miles. Range: $100K - $250K Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - F04 - Pipe Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents