Similar Projects
Canterbury Crossing Senior Housing
New Construction - 25,850 SF
Design
$500,000 to $1,000,000 CJ est. value
Shakopee, MN 55379

Boden Senior Living
New Construction
Design
Inver Grove Heights, MN 55076

RFP Developer - Slayton Golden Living Center Site Development Proposal
Infrastructure
Bidding
$500,000 CJ est. value
Slayton, MN 56172

RFQ Construction Manager - Construction Management Services for the Clay County Substance Abuse Crisis Facility
New Construction, Infrastructure - 21,771 SF
Post-Bid
$13,900,000 CJ est. value
Moorhead, MN 56560

Onamia Rehabilitation
Renovation
Post-Bid
$260,000 est. value
Onamia, MN 56359

Operational Enhancements at MVH Hastings MVH Hastings
Renovation
Results
$960,200 CJ est. value
Hastings, MN 55033

The Pointe Minnetonka
New Construction
Construction
Minnetonka, MN 55305

Snelling Yards Senior Living Facility
New Construction
Construction
Minneapolis, MN 55406

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

2901 Chicago Avenue South
Renovation - 71,525 SF
Pending Verification
Minneapolis, MN 55407

Suite Living of Rosemount
New Construction, Infrastructure
Design
$10,300,000 CJ est. value
Rosemount, MN 55068

Furniture, Furnishings, and Equipment for Minnesota Veterans Home
Renovation
Post-Bid
$600,000 CJ est. value
Montevideo, MN 56265

Chanhassen Independent Living
New Construction - 166,024 SF
Construction
$30,000,000 est. value
Chanhassen, MN 55317

Rice Creek Commons
New Construction, Infrastructure - 1,400,000 SF
Pending Verification
$750,000,000 CJ est. value
Arden Hills, MN 55112

Rivers Edge Assisted Living
New Construction, Infrastructure - 28,598 SF
Design
$8,000,000 CJ est. value
Brooklyn Park, MN 55443

Last Updated 12/20/2022 01:01 AM
Project Title

Replace Therapy Tubs at Forensic Nursing Facility

Physical Address View project details and contacts
City, State (County) Saint Peter, MN 56082   (Nicollet County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $485,678 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Therapy Tubs at Forensic Nursing Facility. Est. Completion Date: July 31, 2023 Preregistration and background checks are mandatory for the prebid conference. E-mail no later than November 1, 2022 at 2:00 pm CT to the following address: troy.m.williams@state.mn.us. a. The email should be titled "Request to Pre-Register" and shall include a copy of the requester's driver's license. An event letter will be completed by the Facility and notifications returned via email to the requester. This project has a Enter TG/ED/VO Subcontracting Goal.% Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. Targeted Group, Economically Disadvantaged, and Veteran-Owned small businesses that can be used to meet subcontracting goals MUST be certified by the Department of Administration, Office of State Procurement at the time of the subcontractor's work on the construction project. The Section 00 41 73 Prime Contractor Response Form, which includes the attachments listed in the project manual table of contents, is posted within the electronically Room. The Response Form must be downloaded, completed, and uploaded with the bid before it can be posted. All questions should be submitted no later than November 14, 2022 at 2:00 pm CT to Katy McCann, katy.mccann@state.mn.us. The State is not obligated to answer questions submitted after the question due date and time. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor, not as a subcontractor, the work for at least three (3) contracts which have achieved Substantial Completion since 12/31/18 for construction of similar type Commercial Remodeling. Each of these contracts MUST have had a construction value of $250,000 or greater. 2. Project Manager and Job Superintendent responsible for this project EACH has had at least five (5) years of experience with Commercial Remodeling projects similar in scope and value to this project. Each of these contracts must have had a construction value of $250,000 or greater. A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Furnishing all labor, materials and equipment required for the demolition and complete construction of the Therapy Tub Renovations.

Details

1,260 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents