Similar Projects
County Road 136 Improvements
Bidding
Less than $3,599,000 est. value
Saint Cloud, MN 56301

2021 Bituminous Street Resurfacing Improvements Phase 1
Infrastructure
Bidding
$993,000 est. value
Saint Cloud, MN

Bituminous Paving of Vails Lake Road
Post-Bid
Paynesville, MN

North Smoky Hills Graveling
Renovation
Post-Bid

Grading, Bituminous Surfacing and ADA Improvements
Results

228th Street Improvements Reclamation and Paving
Results
Saint Augusta, MN 56301

2021 Lake Wobegon Trail Maintenance
Post-Bid
Waite Park, MN

CR 186 Concrete Overlay
Results
$2,200,000 to $2,500,000 est. value
Sauk Centre, MN 56378

2021 Bituminous Patching
Results
$9,000,000 to $10,000,000 est. value
MN

Hadrian Road-Granite City Crossings and Lenzmeier Addition Drainage Improvements
Results
Saint Cloud, MN 56301

Spent Lime Regional Stormwater Treatment System and 6th Street North Stormwater Sump Retrofit
Results
Saint Cloud, MN 56301

2021 Roadway Improvements
Results
$270,000 to $300,000 est. value
MN

2021 Seal Coat
Results
Melrose, MN

Grading, Bituminous Surfacing, ADA Improvements, and Retaining Walls
Results
MN

2021 Street Improvements
Results
Melrose, MN

Reported 05/14/2021 12:00 AM
Project Title

South Junior High Site Reconfiguration

Physical Address View project details and contacts
City, State (County) Saint Cloud, MN 56301   (Stearns County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected August 2021
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and reconfiguration of parking lots and tennis courts at South Jr. High in St. Cloud. This work includes miscellaneous removals, grading, aggregate base, bituminous pavement, curb & gutter, sidewalk, pavement markings, signage, tennis courts, storm sewer, stormwater chambers, erosion control and turf establishment.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents