Similar Projects
Contract 1: Raw Water Transmission Pipeline Contract 2: 56th and Kincaid Pipeline
Infrastructure
Bidding
$300,000 CJ est. value
Topeka, KS 66612

El Dorado Correctional Facility Administration Building Chilled Water Piping System Improvements
Renovation
Sub-Bidding
$110,000 CJ est. value
El Dorado, KS 67042

Piping Improvements and Water Meter Replacement
Renovation, Infrastructure
Post-Bid
Less than $1,250,000 est. value
Wichita, KS 67205

2022 JCPRD Mechanical and Plumbing Services IDIQ
Term Contract
Post-Bid
KS

Salina ERCIP Photovoltaic Solar Power and Water Reduction
Alteration
Results
Less than $2,691,821 est. value
Salina, KS

ARCP Underground Hydronic Piping Upgrades
Alteration
Results
New Century, KS 66031

Jefferson County Jail Phase 1 Plumbing Fixture Replacement
Alteration
Post-Bid
$250,000 to $500,000 est. value
Oskaloosa, KS 66066

Facilities Management - (Electrical, Plumbing, Painting, Carpentry, HVAC ,Trenching and Masonry)
Term Contract
Results
KS

Temporary Bypass Pumping On-Call
Alteration
Post-Bid
Olathe, KS

On-Call Plumbing Services
Term Contract
Results
De Soto, Edgerton, Gardner, Leawood, Lenexa, Merriam, Mission, New Century, Olathe, Overland Park, Prairie Village, Roeland Park, Shawnee, Spring Hill, KS 66061

Prairie Band Potawatomi Nation (PBPN) Health Center - Low Flow Water Saving
Alteration
Post-Bid
$400,000 est. value
Mayetta, KS 66509

Oak Park/Century Estates Storm Drainage Improvements
Infrastructure
Results
$3,053,477 CJ est. value
Lenexa, KS 66215

Streambank Stabilization work at John Redmond #2
Infrastructure
Post-Bid
$250,000 CJ est. value
Burlington, KS 66839

Booster Pump Station Improvements
Infrastructure
Results
$92,326 CJ est. value
Wolf Creek, KS 67481

Basehor Civic Campus - Mass Grading Project
Infrastructure
Post-Bid
$65,000 CJ est. value
Basehor, KS 66007

Last Updated 12/01/2022 03:03 PM
Project Title

Morton Road 6" Waterline Project

Physical Address View project details and contacts
City, State (County) Atchison, KS 66002   (Atchison County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $699,488 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

*As of December 1, 2022, an apparent low bidder has been identified, however, a contractor has not been awarded. A prebid meeting will not be held. The Project consists of installation of approximately 5 1/4 miles of 6-inch PVC waterline. 6" Valve 7 EA 6 3" Valve 1 EA 7 2" Valve 1 EA 15 Connection to Existing Pipe 3 EA TOTAL CONSTRUCTION COST ARTICLE 6-TIME OF COMPLETION 6" CL 250 PVC Pipe 6" CL 250 RJ. PVC Pipe 6" CL 200 PVC Pipe 8" Valve 6" Road Crossing 6" Type 3 Stream Crossing 6" Type 2 Stream Crossing 2" Meter Setting 2" Post Hydrant 2-Way Fire Hydrant Air Release Valv All Bids must be filed in said office on or before the time herein set, on forms furnished by the Owner, and must be enclosed in a separate sealed envelope and plainly identified. Bids received will be acted upon by the Owner at the time and place above specified or at such later time and place as may then be fixed. The Owner hereby reserves the right to reject any or all Bids, to waive informalities and irregularities and to enter into such contracts as it may deem to be for the best interests of the Owner. Completion- 90 calendar days 1. Morton Road 6-lnch Waterline, which consists of approximately 5 % miles of 6-inch PVC waterline. 2. The Site of the Work includes property, easements, and designated work areas described in greater detail in the Contract Documents but generally located 5 miles northwest of Atchison, KS.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents