Similar Projects
5th District Storm Water Improvements - Schneider Avenue and 171st Street
Infrastructure
Bidding
Hammond, IN 46320

Project D - Sewer Separation Projects - Part 1 and 2
Infrastructure
Bidding
Churubusco, IN

Alexander Street Storm & Sanitary Sewer Installation
Post-Bid
Bremen, IN 46506

2020 Guaranteed Savings Contract Provider RFQ
Post-Bid
Muncie, IN 47302

Grace Street Storm Sewer Improvement
Results
Less than $565,000 est. value
Highland, IN 46322

8th & Ohio Drainage Improvement
Results
Jeffersonville, IN 47130

Sanitary Main & Three Phase Extension
Infrastructure
Bidding
Greenfield, IN

Lindley Ditch Stormwater
Post-Bid
Huntington, IN

Southeastway Septic System
Results
$70,000 to $80,000 est. value
Indianapolis, IN 46225

2021 Doughty Road Stormwater Improvement
Infrastructure
Bidding
Lawrenceburg, IN 47025

Graham Street Storm Sewer Replacement
Post-Bid
Franklin, IN 46131

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Storm Sewers - Indy Regional - Phase II
Infrastructure
Bidding
Indianapolis, IN

Helmsburg Stormwater Improvements
Post-Bid
Nashville, IN 47448

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Last Updated 06/30/2021 03:23 PM
Project Title

Stormwater System Improvements

Physical Address View project details and contacts
City, State (County) Knightsville, IN   (Clay County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $656,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes the installation of approximately 1,195 lineal feet of new storm sewer ranging in size from 12" to 48" along several town streets, as well as a section on the north and south sides of US40. Work also includes regrading of approximately 1,310 lineal feet of existing drainage swale/channel and construction of approximately 235 lineal feet of new roadside swales. The regrading of the existing swales includes the installation of approximately 2,250 tons of rip-rap for bank stabilization. The base bid shall also include all site restoration, erosion control, maintenance of traffic (including lane closures along US40), and all other ancillary work required to complete the project as generally designed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents