Similar Projects
Norton Creek Flood Control - 603-60-22524 - City of Fridley
Infrastructure
Conception
$900,000 CJ est. value
Fridley, MN 55432

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

Medium Mill and Overlay - TH 65
Infrastructure
Design
$3,100,000 CJ est. value
McGregor, MN 55760

Sola Riverdale
New Construction, Infrastructure - 12,296 SF
Design
$3,000,000 CJ est. value
Coon Rapids, MN 55448

Kellys Sample Pool Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Anoka, MN 55303

DNR R2 McGrath Power Shovel Excavation
Infrastructure
Post-Bid
McGrath, MN 56350

DNR2 Aitkin State Forest Road Shovel Excavate
Infrastructure
Post-Bid
Aitkin, MN

Siwek Park Improvements
Renovation, Infrastructure
Results
$375,000 est. value
Saint Francis, MN

ISD 11 High School Multipurpose Fields
New Construction, Infrastructure
Results
Anoka, MN

Andover High School Storage Garage Addition
Addition, Renovation, Infrastructure
Construction
$197,440 CJ est. value
Andover, MN 55304

Radisson Hills
New Construction, Infrastructure
Construction
$18,000,000 CJ est. value
Blaine, MN 55449

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Rural Reserve Trunk Sanitary Sewer - 24-48200-01 - City of Andover
Renovation, Infrastructure
Conception
$3,800,000 CJ est. value
Andover, MN 55304

Lil Explorers Childcare Center
New Construction, Infrastructure - 16,299 SF
Design
$3,300,000 CJ est. value
Ramsey, MN 55303

Last Updated 04/26/2023 12:06 PM
Project Title

CRWD Earthen Dams

Physical Address View project details and contacts
City, State (County) Austin, MN 55912   (Mower County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $297,036 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of work for the project consist of constructing two earthen embankment dams. The major items of work consist of the following approximate quantities: Common Excavation, 13,230 CY; Common Embankment, 16,780 CY; RC Pipe (various sizes, 21" to 30"), 142 LF; 72" RC Precast Manhole, 2 EA; Class IV Riprap, 215 CY; Drain Tile (various sizes, 4" to 18"), 3,325 LF; Seeding, 2.4 AC; Cover Crop Seeding, 17 AC The Cedar River Watershed District reserves all authority to accept or reject any or all bids and to waive informalities therein. Site Directions: Section 36 Red Rock Township. Approximately 6 miles east of Austin, MN on I90. Both dams are in the section of land between I90 and 230th St, east of CSAH 19 (610th Ave) Bids must be accompanied by a bidder's bond equal to at least five percent (5%) of the total amount of the bid Est. Completion Date: Sept. 30, 2023

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents