Similar Projects
Asphalt Paving
Bidding
Downingtown, PA

Skin Patching Project
Bidding
Nottingham, PA

Great Valley Middle School Site Paving & Wall Restoration Phase 2
Post-Bid
$950,000 est. value
Malvern, PA 19355

Road Improvements 2020
Post-Bid
Elverson, PA 19520

Creek Drive Paving Project 2019
Results
Wayne, PA 19087

Roadway and Miscellaneous Repairs Between Milepost 299.98 and Milepost 356.42, Between Milepost H-40.83 and Milepost H-43.44 and Between Milepost A-20.00 and Milepost A-31.34
Term Contract
Results

2021 Road Improvement Project
Bidding

Chip Seal of Township Roads
Post-Bid
Chester Springs, PA 19425

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2021 Resurfacing Contract
Bidding
Malvern, PA

Asphalt Resurfacing
Post-Bid
PA

2020 Paving and Street Repair Program
Results
$220,000 to $270,000 est. value
West Chester, PA 19382

Bituminous Leveling and Overlay
Bidding
Landenberg, PA

Campus Plaza & Fountain Project Phase I
Post-Bid
$1,500,000 to $2,200,000 est. value
West Chester, PA

Roadway Rehabilitation Phase 1
Results
$100,000 to $500,000 est. value
Downingtown, PA 19335

Last Updated 04/09/2021 01:01 PM
Project Title

2021 Road Repairs (Mill And Overlay) Project - General

Physical Address View project details and contacts
City, State (County) Honey Brook, PA   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

T-377 Wyebrook Road – The work area spans from the intersection with Creek Road to the intersection with Lewis Mill Road. The work area is approximately 23 feet wide and 3,274 feet long. Mill driveways and cross roads. Overlay bituminous wearing course on road and feather to match existing. Seal with rubberized sealer at joints. T-396 Bollinger Road – The work area spans from the intersection with Manor Road to the drive way at 147 Bollinger Road. The work area is approximately 20 feet wide and 5,400 feet long. There are two repair areas identitied. Repair Area #1 is approximately 1000' x 20'. Repair Area #2 is approximately 64' x 4'.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents