Similar Projects
Ductile Iron Pipe and Associated Fittings
Infrastructure
Post-Bid
$60,000 est. value
Spencer, MA 01562

Unidirectional Flushing of approximately 70 miles of the Towns Water Mains.
Infrastructure
Post-Bid
$310,000 est. value
Shrewsbury, MA

New Water Main at NCCI Gardner
Results
Less than $1,000,000 est. value
Gardner, MA 01440

Quabbin Aqueduct Shaft 2 Repairs
Results
Holden, MA

Walnut Street Phase 2 and Canal Street Infrastructure Improvements Schedule A & B
Infrastructure
Post-Bid
$964,000 est. value
Athol, MA

Water Meters/DPWP
Term Contract
Results
Worcester, MA

New Water Main in and Around Newton Street
Infrastructure
Post-Bid
Southborough, MA 01772

2021 Water Main Replacement Project
Results
Less than $1,900,000 est. value
Webster, MA 01570

Water Main Replacement
Infrastructure
Post-Bid
Southborough, MA

Insertion Valves and Tapping Services/DPWP
Term Contract
Results
Worcester, MA

Gardner Transmission Main Replacement Project
Infrastructure
Post-Bid
$827,000 est. value
Gardner, MA

Mason Road and Mason Road Extension Water Main Replacement Project
Results
$2,450,000 est. value
Dudley, MA 01571

Schedule A Walnut Street Infrastructure Improvements Phase 1 and Schedule B Fish Park Sidewalk Improvements
Results
$998,725 est. value
Athol, MA

Sewer / Drainage / Water Construction Services 2021
Results
Leominster, MA

Water Main Replacement Project
Results
East Brookfield, MA

Last Updated 06/14/2022 06:32 AM
Project Title

Flanders Road Water Main Replacement

Physical Address View project details and contacts
City, State (County) Westborough, MA 01580   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the replacement of approximately 4,800 linear feet of existing 8-inch asbestos concrete (AC) water main with new 8-inch DI water main in Flanders Road and Samson Drive, and all new water services including the curb stop, service piping and curb box. Some of the existing 8-inch AC water main pipe will require removal and legal disposal. The new water main will replace an existing water main and all work incidental thereto, in accordance with the Specifications and Drawings. Temporary bypass piping will be required. Miscellaneous drainage improvements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents