Similar Projects
King George Inn Redevelopment
New Construction, Renovation - 18,500 SF
Conception
Allentown, PA 18103

17 South 2nd Street
Renovation
Conception
Harrisburg, PA 17104

Sun Center Studios Hotel
New Construction - 108,000 SF
Design
Aston, PA 19014

The Pizza Grille
Build-Out
Design
Harrisburg, PA 17110

Demolition of Structures and Clearing of Property
Demolition
Post-Bid
Erie, PA 16505

Subway #25823
Renovation - 1,000 SF
Post-Bid
Wilkes-Barre, PA 18706

Restaurant Fit-Out
Results
Montoursville, PA

W Hotel / Element by Westin
New Construction - 715,200 SF
Construction
$240,000,000 est. value
Philadelphia, PA 19102

W Hotel / Element by Westin
New Construction - 715,200 SF
Construction
$240,000,000 est. value
Philadelphia, PA 19102

Berwick Area YMCA
New Construction - 8,000 SF
Conception
$3,300,000 est. value
Berwick, PA 18603

Tru by Hilton Hotel
New Construction
Design
Hazle Township, PA 18202

Subway
Renovation - 842 SF
Post-Bid
Allentown, PA 18102

Homewood Suites
New Construction - 65,000 SF
Construction
$10,000,000 est. value
Carlisle, PA 17013

The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

Tru by Hilton
New Construction - 44,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Grantville, PA 17028

Last Updated 08/31/2020 10:17 AM
Project Title

Lehigh Valley Resort and Spa - Phase I

Physical Address View project details and contacts
City, State (County) Northampton, PA 18067   (Northampton County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Food/Beverage Service, Hotel/Motel
Contracting Method Qualified Bidding.
Project Status Design Development, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, Hotel/Motel, 206 Unit(s), Food/Beverage Service, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents