Similar Projects
Postvale Road, Grier Road Rehabilitation Phase 2 - ST095 - Town of Marana
Infrastructure
Conception
$260,000 est. value
Marana, AZ

Tangerine Road Widening, Phase 2A - ST098 - Town of Marana
Alteration
Conception
$27,000,000 est. value
Marana, AZ 85658

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

NolicCovered Wells Intertie Project (Waterline)
Infrastructure
Post-Bid
$1,000,000 to $3,000,000 est. value
Sells, AZ 85634

High Water Crossing at Vamori Wash
Results
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

Pavement Preservation 2022
Infrastructure
Results
Marana, AZ 85653

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Last Updated 02/27/2023 12:05 AM
Project Title

Safford-Springerville Highway (US 191) (Rose Peak Emergency Relief (ER))

Physical Address View project details and contacts
City, State (County) Comobabi, AZ 85634   (Pima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,736,496 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

TRACS NO 191 GE 205 F0463 01C PROJECT NO 191-224) T TERMINI SAFFORD - SPRINGERVILLE HIGHWAY (US 191) LOCATION ROSE PEAK EMERGENCY RELIEF (ER) ROUTE NO. MILEPOST DISTRICT ITEM NO. US 191 205.99 to 206.09 SOUTHEAST 102808 The amount programmed for this contract is $1,200,000. The location and description of the proposed work are as follows: The proposed work is located in Greenlee County on US 191, starting at Milepost 205.99 and extending north to Milepost 206.09. The work consists of repairing the eroded embankment, constructing embankment protection, replacing damaged pavement, drainage improvements, pavement marking, signing and other related work. The time allowed for the completion of the work included in this contract will be 80 working days. The Arizona Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 4.11. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. This project requires electronic bidding. If a request for approval to bid as a Prime Contractor is received less than 48 hours prior to bid opening, the Department cannot guarantee the request will be acted on. This contract is subject to the provisions of Arizona Revised Statutes Section 42-5075 -- Prime contracting classification; exemptions; definitions. No award will be made to any contractor who is not a duly licensed contractor in accordance with Arizona Revised Statutes 32-1101 through 32-1170.03. All labor employed on this project shall be paid in accordance with the minimum wage rates shown in the General Wage Decision. These rates have been determined in accordance with the requirements of the law and issued by the Secretary of Labor for this project. The wage scale is on file in Contracts and Specifications Section and copies may be obtained at all reasonable times. Persons that require a reasonable accommodation based on language or disability should contact ADOT's Contracts and Specifications Office by phone (602) 712-7221. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation. Las personas que requieran asistencia (dentro de lo razonable) ya sea por el idioma o discapacidad deben ponerse en contacto con ADOT (602) 712-7221. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. AZDOT - Safford-Springerville Highway (US 191) (Rose Peak Emergency Relief (ER)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents