Similar Projects
Tanyard Reservoir Flood Prevention and Mitigation Project
Infrastructure
Results
Bristol, RI

Irving Avenue Stormwater Management and Riverbank Restoration
Infrastructure
Post-Bid
$100,000 est. value
Providence, RI 02906

West Marlborough Street Storm Drain Improvements
Results
Newport, RI 02840

Storm Drain Cleaning, Rooting and Repair
Results
Kingston, RI

Clean Exterior Manholes, Storm and Basins
Infrastructure
Post-Bid
South Kingstown, RI

Stormwater Drainage Improvements on Robin Way and Wicklow Road
Infrastructure
Post-Bid
$2,000,000 est. value
Westerly, RI

Warwick Ponds Buckeye Brook Stormwater Improvements
Infrastructure
Results
Warwick, RI

Stormwater Drainage Improvements on Wauwinnet Avenue
Infrastructure
Results
$300,000 est. value
Westerly, RI 02891

Esmond Park Stormwater Quality Improvements
Results
Smithfield, RI 02917

CSO Phase III A-9 GSI Projects
Infrastructure
Post-Bid
Central Falls, RI 02863

Storm-Water Drainage Inspection
Infrastructure
Results
Westerly, RI

Reported 06/22/2022 12:00 AM
Project Title

Greenwich Bay Upland Stormwater Improvements C-1

Physical Address View project details and contacts
City, State (County) Warwick, RI 02886   (Kent County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PTS ID: 0197M RIC: 2022-CM-029 This project is for the construction of Greenwich Bay Upland Stormwater Improvements at eleven (11) locations within the Greenwich Bay Watershed (Warwick, East Greenwich and West Warwick). This work involves the implementation of Stormwater Treatment Units (STUs, alternately referred to as water quality best management practices or BMPs) for the treatment of stormwater runoff from existing paved surfaces of RIDOT roadways. Construction of the STUs will include cleaning, regrading and stabilization of existing swales, excavation and grading of new STU basins and rehabilitation of existing basins.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents