Similar Projects
Northern Boulevard Expansion Phase II
Bidding
Rio Rancho, NM

Construction services for White Sands Village
Bidding
Pojoaque, NM

Roadway Construction and Storm Drainage
Post-Bid
Bernalillo, NM 87004

Valle de Oro Outlet Structure
Post-Bid
$2,600,000 est. value
Albuquerque, NM 87107

SWNARRC - Demo and Construct Pond Kettles
Demolition
Results
$1,000,000 to $250,000 est. value
Dexter, NM 88230

Calle Baack Roadway and Drainage Improvements
Results
Bernalillo, NM 87004

Fairgrounds Drainage and ADA Compliance Plan
Post-Bid
Portales, NM

City Wide Pond Maintenance
Results
Albuquerque, NM

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

Arroyo Flood Control Authority (Sscafca) Lisbon Channel Improvements Project
Results
Less than $400,242 est. value
Rio Rancho, NM 87124

Altura Avenue Phase III Infrastructure Improvements Project
Post-Bid
Columbus, NM 88029

Vado West Floodplain Repair
Term Contract
Results
$1,000,000 to $5,000,000 est. value
NM

Restore Some Retention Dams and Erosion Control Structures
Post-Bid
Cuba, NM 87013

Wide Flood Control Rehabilitation IX
Results
$1,600,000 est. value
Albuquerque, NM

Non-Point Source Pollution Prevention Project for the Santa Clara Creek Watershed - 2020
Post-Bid
Espanola, NM 87532

Last Updated 12/19/2019 02:25 PM
Project Title

Z--Installation of Continuous Channel Drain for Water

Physical Address View project details and contacts
City, State (County) Kirtland, NM   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

USGS/Albuquerque Seismological Laboratory: USGS at ASL requires proposals for installation of a continuous channel drain for water displacement: - Project requires asphalt saw cutting, excavation, trench grading, concrete pouring as well as other construction disciplines to complete this work. This work will be a replacement of the existing drain system which consists of two inlets plumbed to underground pipes. Removal of existing drainage system coincides with excavation and is also the intention of this contract. All work will be conducted on site at the ASL facility.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Slurry Walls, Bio-Polymer Trench Drain.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents