Similar Projects
Last Updated | 10/17/2023 08:04 AM |
Project Title | RFP - Construction Manager-At-Risk Services for the following project: City of Denison Northwest Water and Wastewater Improvements |
Physical Address | View project details and contacts |
City, State (County) | Denison, TX 75021 (Grayson County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Bidding, Construction start expected June 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $45,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City anticipates the scope of work will consist of, but not limited tom the following major elements: 24-Inch Diameter Waterline - Phase II and Phase III of the Northwest Waterline: Final design support, administration, and construction of up to 20,000 (phase II and III from City property all the way up FM 84) linear feet of 24-inch diameter and 5,500 linear feet of 18-inch PVC waterline. 36-Inch Diameter Interceptor - Phase IV and Phase V of the Northwest Interceptor: Final design support, administration, and construction of an expansion up to 28,500 linear feet (full length) of 36-inch diameter FRP or PVC interceptor. Refer to the Description of Work for additional information. Sanitary Sewer Truck Receiving Station: Final design support, administration, and construction of a sanitary sewer truck receiving station that will be located on City property along the Phase IV section of the 36-inch diameter interceptor. The purpose of the station is to receive sanitary sewer waste from trucks carrying up to 5,000 gallons of liquid waste. Lift Station: Final design support, administration, and construction of a lift station to be phased for buildout capacity of 10 MGD. Dual Force Mains: Final design support, administration, and construction of dual force mains (8-inch and 24-inch) to connect the lift station to Phase V wastewater interceptor. The distance between the lift station and the phase V interceptor is approximately 10,000 feet. The Citys preliminary budgetary estimate range for construction of this Project is approximately $40 million to $45 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |