Similar Projects
Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

Wolf Creek Road Reconstruction Project
Infrastructure
Post-Bid
$240,000 CJ est. value
Ranchester, WY 82839

Wolf Creek Road Reconstruction Project
Infrastructure
Post-Bid
$240,000 CJ est. value
Ranchester, WY 82839

Brooks Street Paving and Retaining Wall
Infrastructure
Results
$620,348 CJ est. value
Sheridan, WY 82801

Brooks Street Paving and Retaining Wall
Infrastructure
Results
$620,348 CJ est. value
Sheridan, WY 82801

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Construction
$25,400,000 CJ est. value
Sheridan, WY 82801

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Construction
$25,400,000 CJ est. value
Sheridan, WY 82801

Falcon Motors Manufacturing Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sheridan, WY 82801

Falcon Motors Manufacturing Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sheridan, WY 82801

North Sheridan Interchange - City of Sheridan
Infrastructure
Conception
$700,000 CJ est. value
Sheridan, WY 82801

2022 Pavement Maintenance
Infrastructure
Post-Bid
$270,000 est. value
Sheridan, WY

Sheridan County Brooks Street Greenspace
Infrastructure
Results
$2,242,139 CJ est. value
Sheridan, WY 82801

Wrench Ranch Master Plan Phase 1
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Sheridan, WY 82801

Last Updated 10/27/2023 09:08 AM
Project Title

Bridge over Tongue River (County Rd. 110)

Physical Address View project details and contacts
City, State (County) Dayton, WY 82836   (Sheridan County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Completion Date: Oct. 31, 2025 Pre-Qualification: Yes Description: Replacement of bridge on Tongue River with detour installation and associated roadway reconstruction at each end of the bridge. Location: Bridge over Tongue River at RM 0.20 on County Road 110 in Sheridan County. WYDOT - 007 - Replacement of bridge on Tongue River

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents