Similar Projects
Pioneer Village Road Maintenance Services
Alteration
Bidding
Colorado Springs, CO

SETR Trinidad Lake State Park Road Rehab Project
Infrastructure
Bidding
Colorado Springs, CO

Protective Coating and Pavement Maintenance
Post-Bid
$1,000,000 to $5,000,000 est. value
CO 80840

Statewide Asphalt
Post-Bid

Homestake Dam Mastic Coating
Results
CO

Barnes Road Roadway Improvements
Results
Less than $2,000,000 est. value
Colorado Springs, CO 80917

Pikes Peak Highway Asphalt Paving
Post-Bid
Cascade, CO 80809

Semu Campsite Renovation Project C18mu1, C20mu1
Results
Colorado Springs, CO

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

CO CRVFO Roads & Construction IDR 2020
Results
$25,000 to $150,000 est. value

Falcon Highlands Maintenance Project
Post-Bid
Colorado Springs, CO 80903

CO LSFO Roads & Construction IDR 2020
Results
$25,000 to $40,000 est. value

Pedestrian Bridge and Abutment Landing
Post-Bid
Colorado Springs, CO

CO KFO Roads & Construction IDR 2020
Results
$25,000 to $170,000 est. value

Manitou Avenue Paving from El Paso to Ruxton
Post-Bid
Manitou Springs, CO 80829

Last Updated 05/12/2021 10:26 AM
Project Title

Daniels Pass Trail System Trail Development

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The main Daniels Pass Trail, Bruin Inn Connector and Sweetwater Canyon Trails are designated as non-motorized recreational trails open to hiking, mountain biking and equestrian use. The new Mt. Muscoco Trail will serve as a hiking-only trail segment from the Sweetwater Canyon Trail to the existing Mt. Muscoco trail just east of the project area. The project site ranges in elevation from 7,050’ at Segment 1 crossing of Cheyenne Creek to 7,830’ at Gold Camp Road. The saddle on Daniels Pass is at 7,560’ in elevation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents