Similar Projects
Holland Pointe Lift Station - SAN-18-001 - City of Norwalk
New Construction, Infrastructure
Conception
$723,500 CJ est. value
Norwalk, IA 50211

Timber View Park And Blooming Heights - P&R-17-004 - City of Norwalk
Infrastructure
Conception
$700,000 CJ est. value
Norwalk, IA 50061

Highway 28 & Beardsley Intersection Improvements - STR-16-005 - City of Norwalk
Infrastructure
Design
$3,500,000 CJ est. value
Norwalk, IA 50211

Highway 28 & Beardsley Intersection Improvements - STR-16-005 - City of Norwalk
Infrastructure
Design
$3,500,000 CJ est. value
Norwalk, IA 50211

PCC Patching - IOWA 14
Infrastructure
Bidding
$1,000,000 CJ est. value
Norwalk, IA 50211

PCC Patching - IOWA 14
Infrastructure
Bidding
$1,000,000 CJ est. value
Norwalk, IA 50211

Sewer Manhole Rehabilitation by Lining Process
Infrastructure
Post-Bid
$80,000 CJ est. value
Indianola, IA 50125

Sewer Manhole Rehabilitation by Lining Process
Infrastructure
Post-Bid
$80,000 CJ est. value
Indianola, IA 50125

PCC Pavement - Grade and Replace
Infrastructure
Results
IA

Sunset Dr/IA Highway 28 and North Avenue Intersection Improvements
Infrastructure
Results
$2,088,769 est. value
Norwalk, IA

Indianola Daycare
New Construction, Infrastructure - 10,527 SF
Construction
$1,000,000 CJ est. value
Indianola, IA 50125

Storm Sewer - City Of Indianola
Infrastructure
Pending Verification
$600,000 CJ est. value
Indianola, IA 50125

Storm Sewer - City Of Indianola
Infrastructure
Pending Verification
$600,000 CJ est. value
Indianola, IA 50125

Traffic Signals at Highway 28 And Echo Drive - STR-16-012 - City of Norwalk
Infrastructure
Conception
$400,000 CJ est. value
Norwalk, IA 50211

Freedom Storage Phase 2
New Construction, Infrastructure - 57,950 SF
Design
$6,300,000 CJ est. value
Carlisle, IA 50047

Last Updated 05/15/2023 09:36 AM
Project Title

Bronze Street Trunk Sanitary Sewer - E104PW99 SS124 - City of Des Moines

Physical Address View project details and contacts
City, State (County) Norwalk, IA 50211   (Warren County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a combination of future sanitary sewer trunk sewer projects that will allow areas of the City to develop where there is currrently insufficient sewer capacity. Future projects where timing is uncertain include: BRONZE STREET TRUNK SEWER - construction of a trunk sanitary sewer for a portion of the annexed area of Warren County within the Highway 5 Corridor Study lying south of Bronze Street and east and west of County Road R 63; EAST ARMY POST ROAD TRUNK SEWER - This project provides for the construction of a trunk sanitary sewer ranging in size from 10-inch to 15-inch to provide sanitary sewer service for the area lying north of East Army Post Road from the 3000 block to Indianola Avenue, and on the north and south sides of East Army Post Road from Indianola Avenue to the 1900 block of East Army Post Road; and SOUTHEAST RIDGE TRUNK SEWER - Multiple phases to provide sanitary sewer service to an area annexed in Warren County south of East County Line Road, and in Polk County east of S.E. 30th Street and south of Hart Avenue and West of Hwy-6. Connection fee districts will be established for each area. As of February 24, 2021 this project is in the City of Des Moines FY 2021-2026 CIP. A designer is not identified. Information regarding bidding for contractor or a firm timeline has not been established.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of May 15, 2023, no new information available

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents