Similar Projects
New Wastewater Treatment Plant
New Construction
Design
$46,000,000 est. value
Charlestown, IN

Guaranteed Savings Contract
New Construction
Bidding
Avon, IN

Valparaiso City Utilities WWTF Ferrous Chloride Storage Improvements
Renovation
Bidding
Valparaiso, IN

Wastewater Utility Rehabilitation
Post-Bid
Ladoga, IN 47954

Peak Excess Flow Treatment Facility
Post-Bid
Kokomo, IN

WWTP Final Clarifier Nos. 4-5, Aeration Tank Nos. 1-4 and Disinfection
Results
South Bend, IN 46628

Wastewater Utilities Improvements
Results
Chesterfield, IN 46017

Wastewater Utility Improvements
Alteration
Bidding
Frankfort, IN

West WWTP Renewable Natural Gas (RNG) System
Post-Bid
Evansville, IN

Wastewater Treatment Plant Improvements
Results
Salem, IN

Preconstruction Phase Services and Construction Phase Services for the Expansion to the Existing Wastewater Treatment Plant Facility
New Construction
Bidding
Topeka, IN

Phosphorus Removal Chemical Building
Addition
Post-Bid
Linton, IN

WWTP Rehabilitation and Expansion
Results
Sellersburg, IN

Water Improvements Project
Renovation
Bidding
Hazleton, IN

Waste Water Treatment Plant Capacity Upgrades – Phase 2
New Construction
Post-Bid
Elkhart, IN

Last Updated 03/28/2022 02:27 PM
Project Title

Sediment Dewatering Facility (SDF) Stage 1

Physical Address View project details and contacts
City, State (County) Cedar Lake, IN   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clearing and brushing, excavation and embankment of the proposed SDF facility, pipe removal, swale construction, installation of SESC measures, culvert, storm sewer, underdrain installation, casing pipe boring work under a railroad, casting/installation of timber and concrete water control structure, aggregate road construction, HMA patching, chain link fence and gate installation, and landscaping restoration. Layout/surveying will be necessary for the work and should be included within the bid price. It is important to the Town that the work be conducted in a timely, organized, and sequential manner.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents