Similar Projects
Asphalt Concrete, Bituminous Mixes, Equipment Rental, and Material Hauling
Term Contract
Post-Bid

Asphalt Concrete, Bituminous Mixes, Equipment Rental, and Material Hauling (MBE Bidders Only)
Term Contract
Post-Bid

Material Disposal
Results

CUVA South Snow & Ice Removal
Results
Akron, OH

Snow Plows
Post-Bid

CUVA North Snow & Ice Removal
Results
Akron, OH

Citywide Waste and Recycling Collection Services
Term Contract
Post-Bid
Tallmadge, OH 44278

Disposal Services for Waste Oil
Results

Snow Removal Services
Term Contract
Post-Bid
Stow, OH 44224

Solid Waste Disposal and Recycling
Term Contract
Results
Sagamore Hills, OH 44067

Solid Waste and Recycling Services
Term Contract
Post-Bid
Copley, OH

Refuse Services, Multi-Site Ohio, Oh105
Results
Blacklick, Bryan, Chillicothe, Cincinnati, Columbus, Dayton, Delaware, Lima, Maineville, Milan, Monclova, North Canton, Sharonville, Trenton, Troy, Twinsburg, Whitehall, OH

2020-2021 Senior Snow Removal Program
Term Contract
Post-Bid
Cuyahoga Falls, OH 44221

Public Properties Snow Removal Program
Results
Hudson, OH 44236

Material Disposal
Term Contract
Post-Bid

Last Updated 10/29/2020 03:31 PM
Project Title

Supply Water and Delivery to Cuyahoga Valley NPS

Physical Address View project details and contacts
City, State (County) Sagamore Hills, OH   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Offeror to provide all labor, materials, tools, supplies, equipment, transportation, and supervision necessary to provide BULK POTABLE WATER to various locations within the 33,000 acre Cuyahoga Valley National Park. Water transport and delivery shall be within Ohio EPA regulations. Water tanks to be filled by the offeror on a routine basis. The offeror is responsible for checking the water level of the tanks and filling as needed to ensure that the park does not run out of water in any location.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents