Similar Projects
North Section Rehabilitation - NP-GWMP 1(3), 2(5)
Design
$100,000,000 est. value
Arlington, VA

North Section Rehabilitation - NP-GWMP 1(3), 2(5)
Design
$100,000,000 est. value
Arlington, VA

Smart Scale - Road and Bridge Widening Over Massaponax Creek
New Construction, Infrastructure
Bidding
$12,623,000 est. value
VA

SGR - Superstr Repl Rte 29 NB Over Cub Run
New Construction, Infrastructure
Bidding
$3,418,000 est. value
VA

Repair Pentagon Transit Center (PTC) Bridge
Post-Bid
$10,000,000 to $25,000,000 est. value
Arlington, VA

Freeman Store Pedestrian Bridge
Post-Bid
$500,000 to $749,999 est. value
Vienna, VA 22180

Deer Park Footbridge Replacement
Results
Newport News, VA 23607

Roanoke River Greenway Bridge Across
Results
Roanoke, VA 24011

Churchland Bridge Replacement Project
Construction
$29,500,000 est. value
Portsmouth, VA 23701

SGR - Bridge Replacement over Catoctin Creek
New Construction, Infrastructure
Bidding
$1,415,000 est. value
VA

Heat Straightening Bridge Maintenance Services
New Construction
Post-Bid
McLean, VA 22067

Jordan Bridge Construction on George Washington & Jefferson NF
Results
$500,000 to $1,000,000 est. value
Natural Bridge, VA 24579

Triple Decker Bridge Rehabilitation
Renovation
Bidding
Less than $8,900,000 est. value
Chesapeake, VA 23322

Bridge Maintenance (Sump Pump Installation)
New Construction
Post-Bid
Norfolk, VA 23523

Modular Steel Pedestrian Bridge Construction
Results
Lexington, VA

Reported 02/23/2022 12:00 AM
Project Title

Bridge Maintenance and Repair

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23507   (Norfolk City County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To replace an electrical terminal cabinet in the Berkley Bridge eastbound south span machinery platform as specified herein and in the plan set. The Berkley Bridge is a double leaf rolling bascule span movable bridge crossing the Elizabeth River located on 1-264 in Norfolk,Virginia.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents