Similar Projects
Countywide Cabling Servies
Term Contract
Bidding
Oakland, CA 94612

Doolan Tower Back Up Generator
Renovation
Sub-Bidding
$200,000 CJ est. value
Livermore, CA 94551

Install Rectangular Rapid Flashing Beacon Systems
Infrastructure
Sub-Bidding
$6,900,000 CJ est. value
Sunol, CA 94550

Install lighting system
Infrastructure
Post-Bid
$3,010,000 est. value

HVAC Installation and Energy Infrastructure
Alteration
Post-Bid
Union City, CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Standby Power Generation System Upgrade
Alteration
Results
Union City, CA

Install Radar Speed Feedback Sign Systems and Modify Signals
Infrastructure
Sub-Bidding
$2,120,000 CJ est. value
Sunol, CA 94550

Install a Diesel Generator on Trailer
Alteration
Post-Bid
Dublin, CA 94568

Photo-Voltaic (PV) System Maintenance and Repair Services
Alteration
Results
CA

Electrical Improvements at Ettie Street and Lake Merritt Pump Stations
Renovation
Sub-Bidding
$1,120,000 CJ est. value
Oakland, CA 94612

As Needed Repair Services for Medium Voltage Systems
Alteration
Post-Bid
Livermore, Pleasanton, CA 94550

Building Electrification, Electric Vehicle Charger, and Low Carbon Concrete Building Code Assistance
Alteration
Results
Dublin, CA

Citywide Signal Communication Upgrade Conduit Installation For Future Fiber Interconnect On Dublin Boulevard
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Dublin, CA 94568

Eaton 9E-40-60 Eaton UPS Battery Replacement
Term Contract
Post-Bid
Berkeley, CA 94710

Last Updated 12/04/2022 11:54 PM
Project Title

Generator Repairs

Physical Address View project details and contacts
City, State (County) Berkeley, CA 94710   (Alameda County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The USDA ARS requires that all labor, supervision, tools, and materials be provided to Replace 3 automatic transfer switches, replace a generator governor, test/diagnose a generator and provide a report, an reroute a generator fuel line IAW the Statement of Work (SOW). All work shall be performed in accordance with the terms, conditions, drawings and specifications contained in this solicitation and ensuing contract. Please see attachments for more information. Period of Performance: 12/09/2022 to 02/07/2023 0001 Provide all labor, materials, equipment, 1 LO supplies, supervision and transportation to complete generator work and transfer switch replacement IAW the terms and conditions, Statement of Work, and other attachments set forth in the RFQ. Product/Service Code: Z1JZ Product/Service Description: MAINTENANCE OF MISCELLANEOUS BUILDINGS Delivery: 60 Days After Notice to Proceed IAW FAR 36.204, the estimated magnitude of this project is between $100,000 and $250,000. This is a 100% Total Small Business Set-Aside under NAICS 2138210 with a size standard of $16.5M. Completion shall be 60 days after Notice to Proceed (NTP). Dept. of Labor General Decision CA20220018 dated 10/21/2022 is applicable to this contract. All questions pertaining to this solicitation, including questions that arise during the site visit, must be submitted to Michael.Sherlock@usda.gov 1:00 p.m. Pacific Time, November 18, 2022. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents