Similar Projects
Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Bidding
$20,000,000 est. value
WA

I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

Bremerton Station
Renovation, Infrastructure
Pending Verification
Bremerton, WA 98310

Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

SR 20, Rocky Creek to Granite Creek
Infrastructure
Bidding

Stormwater Management Plan
Alteration
Post-Bid
WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Highway 99 Gateway and Revitalization Project
Infrastructure, Alteration
Bidding
Edmonds, WA 98020

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

Last Updated 04/11/2022 01:25 PM
Project Title

Terminal Apron Reconstruction and Overlay Phase 1

Physical Address View project details and contacts
City, State (County) Burlington, WA 98233   (Skagit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000,000 to $7,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major elements of work for the project include full-depth pavement reconstruction, asphalt overlay, cold milling, storm drain improvements, aircraft tie-down anchor installation, pavement marking, and miscellaneous work associated with the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents