Last Updated | 02/27/2023 12:21 PM |
Project Title | Campground Development Phase II, Comfort Station Rebid, Palisades State Park |
Physical Address | View project details and contacts |
City, State (County) | Garretson, SD 57030 (Minnehaha County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Misc. Recreational, Park/Playground, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $687,594 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Each bid in excess of $100,000.00 must be accompanied by a certified check, cashier's check or draft in the amount of 5% of the base bid and all add alternates and drawn on a State or National Bank or a 10% bid bond issued by a surety authorized to do business in the State of South Dakota and made payable to the Department of Game, Fish and Parks of the State of South Dakota. Anyone requesting, reviewing, or copying plans and specifications for this project (such individual is hereinafter referred to as "bidder") agrees that they are doing so for the sole purpose of submitting a bid on the project. The South Dakota Department of Game, Fish and Parks reserves the right to reject any or all bids and to waive any irregularities therein. Technical questions can be forwarded to Dave Lorang, davel@bannerassociates.com; Phone: 605.696.9125 SCOPE: The scope is as defined on the project drawings and in the project manual. Test, adjust, and balance the following: 1. Plumbing Pumps. 2. HVAC Pumps. 3. Air Coils. 4. Air Handling Units. 5. Fans. 3.11 MINIMUM DATA TO BE REPORTED A. Electric Motors: Phase 2 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC 1. Manufacturer. 2. Model/Frame. 3. HP/BHP. 4. RPM. 5. Service factor. 6. Sheave Make/Size/Bore. B. V-Belt Drives: 1. Identification/location. 2. Required driven RPM. 3. Driven sheave, diameter and RPM. 4. Belt, size and quantity. 5. Motor sheave diameter and RPM. 6. Center to center distance, maximum, minimum, and actual. C. Cooling Coils: 1. Identification/number. 2. Location. 3. Service. 4. Manufacturer. 5. Air flow, design and actual. 6. Water flow, design and actual. 7. Water pressure drop, design and actual. 8. Entering water temperature, design and actual. 9. Leaving water temperature, design and actual. 10. Air pressure drop, design and actual. D. Heating Coils (not required on reheat coils): 1. Identification/number. 2. Location. 3. Service. 4. Manufacturer. 5. Air flow, design and actual. 6. Air pressure drop, design and actual. E. Air Moving Equipment: 1. Location. 2. Manufacturer. 3. Model number. 4. Serial number. 5. Arrangement/Class/Discharge. 6. Air flow, specified and actual. 7. Return air flow, specified and actual. 8. Outside air flow, specified and actual. a. Adjust for both minimum and maximum quantities 9. Total static pressure (total external), specified and actual. 10. Inlet pressure. 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC 11. Discharge pressure. 12. Pressure at midpoint of supply duct system 13. Pressure at midpoint of return duct system 14. Pressure at inlet to end of system air terminal unit 15. Sheave Make/Size/Bore. 16. Number of Belts/Make/Size. 17. Fan RPM. F. Exhaust Fans: 1. Location. 2. Manufacturer. 3. Model number. 4. Serial number. 5. Air flow, specified and actual. 6. Total static pressure (total external), specified and actual. 7. Inlet pressure. 8. Discharge pressure. 9. Sheave Make/Size/Bore. 10. Number of Belts/Make/Size. 11. Fan RPM. G. Duct Leak Tests: 1. Description of ductwork under test. 2. Duct design operating pressure. 3. Duct design test static pressure. 4. Duct capacity, air flow. 5. Maximum allowable leakage duct capacity times leak factor. 6. Test apparatus: a. Blower. b. Orifice, tube size. c. Orifice size. d. Calibrated. 7. Test static pressure. 8. Test orifice differential pressure. 9. Leakage. |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |